INSP-Final Inspection | 12/21/2006 | 12/21/2006 | 12/21/2006 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 12/5/2006 | 12/6/2006 | 12/6/2006 | A | PART |
Forrest France
|
|
|
Approved for cover at the drop ceiling areas.
|
INSP-Sprinkler Rough-in/Hydro | 12/4/2006 | 12/5/2006 | 12/5/2006 | A | FAIL |
Forrest France
|
|
|
Heads are overspaced to an adjacent wall as installed at pod #3. Sprinkler rough-in is acceptable for cover at the drop ceilings in pod #6.
|
Sprinkler Plan Check | 11/22/2006 | | 11/22/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/22/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/22/2006 | | 11/22/2006 | | DONE |
|
|
|
|
Telephone call | | | 11/22/2006 | | DONE |
|
|
|
t/c w Brodie S. at TVFP ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 11/22/2006 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/22/2006 | | DONE |
|
|
|
|
Application received | | | 11/20/2006 | | |
|
|
|
|
Pending Assignment by SAM | 11/20/2006 | | | | |
|
|
|
|