Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR06-00939
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 610 W IDAHO ST
Project NameSPR-OLD SPAGHETTI FACTORY
Customer Number 
ePlanReview 
Description
(OLD SPAGHETTI FACTORY - TENANT IMPROVEMENT) This building is required to be fire sprinklered for area increase and for fire area. To construct a restaurant within a 10,584 square foot, 1 story building. Work is to include interior nonbearing walls, three restrooms accessible to the disabled, suspended acoustical ceilings, suspended wood ceilings, suspended gypsum board ceilings, interior doors, interior windows, millwork, and finishes. The building shell work (seismic upgrade, alterations to the roof structure, new wall openings, a new concrete slab on grade, fixed awnings, and new exterior windows and doors) was done under permit BLD06-02785. Interior non-structural demolition was done under permit BLD06-03204. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. DRH06-00273 **CJW** Phoenix Fire Protection to install fire sprinkler underground supply piping to existing building.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/15/20075/16/20075/16/2007APASS
DetailsForrest France
Permit for the UG fire supply line portion of this project finaled.
INSP-Sprinkler Rough-in/Hydro5/3/20075/4/20075/4/2007APART
DetailsForrest France
Noted missing coverage above the drop ceiling areas north of the kitchen, one ssu is blocked at the storage area by a roof access, missing hanger at one east branch line, approved plans not available on site as required.
INSP-Supply line flush5/1/20075/1/20075/1/2007PPART
DetailsForrest France
UG fire supply line flush completed satisfactory per inspection by S. Arellano.
INSP-Sprinkler Rough-in11/29/200611/30/200611/30/2006PPASS
DetailsTroy Cobbley
Underground supply line is ok to cover
Issue and Print Permit  11/29/2006 DONE
Sprinkler Plan Check11/28/2006 11/28/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  11/28/2006 DONE
Inspection Record Card- Fire11/28/2006 11/28/2006 DONE
Telephone call  11/28/2006 DONE
lft vm with trent rice ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  11/28/2006 DONE
Case Summary  11/27/2006 DONE
Application received  11/27/2006  
Pending Assignment by SAM11/27/2006