INSP-Final Inspection | 3/21/2007 | 3/21/2007 | 3/21/2007 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 3/15/2007 | 3/16/2007 | 3/16/2007 | A | PASS |
Troy Cobbley
|
|
|
The only items needing correcting are the removal of the remaining sprig-ups and the addition of one hanger
|
INSP-Sprinkler Rough-in | 3/13/2007 | 3/13/2007 | 3/13/2007 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations where the sprinkler piping can be covered by the lay-in tile.
|
INSP-Sprinkler Rough-in | 2/28/2007 | 2/28/2007 | 2/28/2007 | P | PART |
Troy Cobbley
|
|
|
See the city approved plans for locations where the overhead sprinkler piping is ok to cover
|
Sprinkler Plan Check | 12/1/2006 | | 12/18/2006 | | PASS |
|
|
|
Plan review done by Bryan Johnson
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/18/2006 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 12/18/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 12/18/2006 | | |
|
|
|
|
Inspection Record Card- Fire | 12/18/2006 | | 12/18/2006 | | DONE |
|
|
|
|
Telephone call | | | 12/18/2006 | | DONE |
|
|
|
tlk to gerald ebeling ###-#### that permit and fees are ready to be picked up
|
Override - Parcel Holds | | | 12/18/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 12/18/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 12/18/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 12/18/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 12/18/2006 | | |
|
|
|
|
Issue and Print Permit | | | 12/18/2006 | | DONE |
|
|
|
|
Application received | | | 11/30/2006 | | |
|
|
|
|
Pending Assignment by SAM | 11/30/2006 | | | | |
|
|
|
|