INSP-Final Inspection | 8/10/2007 | 8/14/2007 | 8/14/2007 | A | PASS |
Forrest France
|
|
|
Corrections are complete, fire sprinkler permit finaled.
|
INSP-Final Inspection | 8/8/2007 | 8/9/2007 | 8/9/2007 | P | PART |
Forrest France
|
|
|
Inspected remainder of permit scope work indicated on sheets FP 2.3.1, 2.2.4, 2.2.2, 2.2.3, and reinspection for items on 2.2.1. All areas are satisfactory with the exception of one missing head as noted on FP2.2.3.
|
INSP-Final Inspection | 8/3/2007 | 8/3/2007 | 8/3/2007 | P | DEFR |
Forrest France
|
|
|
Rescheduled per conversation with contractor.
|
INSP-Final Inspection | 7/31/2007 | 8/3/2007 | 8/3/2007 | A | CANC |
Forrest France
|
|
|
Final bay 10 Phone #: ###-#### Internet Inspection Request from: Greg Kirkes Inspection cancelled from web by: Greg Kirkes
|
INSP-Final Inspection | 7/26/2007 | 8/2/2007 | 7/31/2007 | A | CANC |
Forrest France
|
|
|
final for sprinkler bay 10 Phone #: ###-#### Internet Inspection Request from: Greg Kirkes Inspection cancelled from web by: Greg Kirkes
|
INSP-Final Inspection | 7/24/2007 | 7/26/2007 | 7/26/2007 | A | PART |
Forrest France
|
|
|
Fire sprinkler install is approved for sheets FP 2.0.1,2.1.1,2.1.4, one head is blocked by ductwork & one hallway head is missing an escutcheon-see sheet FP 2.2.1 for locations, corrections required for sheet FP2.1.1 are satisfactory, remainder of work indicated on sheets FP2.3.1,2.2.4,2.2.2,2.2.3 is not yet completed.
|
INSP-Sprinkler Rough-in/Hydro | 7/19/2007 | 7/24/2007 | 7/24/2007 | A | PART |
Forrest France
|
|
|
Plan review for resubmittals completed at city hall.
|
Sprinkler Plan Check | 7/24/2007 | | 7/24/2007 | | PASS |
|
|
|
Review of resubmitted plans; approved subject to satisfactory inspection.Single set of plans submitted, passed along to F. France for on-site inspection.
|
Plan resubmittals received | | | 7/23/2007 | | |
|
|
|
Sheets FP0.0, FPD2.1.1, FPD2.2.1, FPD2.2.2, FPD2.2.3, FP2.0.1, FP2.1.1, FP2.1.4, FP2.2.1, FP2.2.2, FP2.2.3, FP2.2.4, FP2.3.1, FP6.1, FP6.2, FP0.1, FPD2.0.2, FPD2.0.3, FPD2.1.2, FPD2.1.3, FP2.0.2, FP2.0.3, FP2.1.2, FP2.1.3, FP6.1, FP0.0, FP0.0, FPD2.0.2, FPD2.0.3, FPD2.1.1, FPD2.1..1, FPD2.1.2, FPD2.1.3, FPD2.2.1, FPD2.2.2, FPD2.2.3, FP2.0.1, FP2.0.2, FP2.0.3, FP2.1.1, FP2.1.2, FP2.1.3, FP2.1.4, FP2.2.1, FP2.2.2., FP2.2.3, FP2.2.4, FP2.3.1, FP6.1, FP6.2 For revised scope for FIR 06-00959 & FIR07-00553 and taken to Sam Rogers 7/23/07 BAS
|
INSP-Sprinkler Rough-in | 7/16/2007 | 7/16/2007 | 7/16/2007 | A | PART |
Forrest France
|
|
|
See areas approved for cover on the stamped plan set.
|
INSP-Sprinkler Rough-in/Hydro | 7/12/2007 | 7/13/2007 | 7/13/2007 | P | PART |
Forrest France
|
|
|
Red lined areas on approved plans where the OH install is okay for cover, noted one pendent does not match response type-location indicated on plans.
|
Sprinkler Plan Check | | | 7/12/2007 | | DONE |
|
|
|
Discussed permit modifications that Micron intends to make with P. Marcolina and Steve Murdock; sprinkler plans need to be revised prior to inspection to split out Bay 10 from the rest of Bldg 2 which Micron plans to do under a new separate permit.
|
INSP-Sprinkler Rough-in | 7/5/2007 | 7/9/2007 | 7/9/2007 | A | PART |
Forrest France
|
|
|
Underfloor sprinklers are completed and approved, partial inspection for the OH-noted some items are not yet finished, field install has been modified from approved plans including 3" main relocation and pendents in lieu of uprights.
|
INSP-Sprinkler Rough-in | 7/2/2007 | 7/3/2007 | 7/3/2007 | P | DEFR |
Forrest France
|
|
|
Inspection rescheduled per conversation with contractor.
|
INSP-Sprinkler Rough-in | 6/27/2007 | 6/29/2007 | 7/2/2007 | A | PART |
Forrest France
|
|
|
Inspection for the underfloor fire sprinklers is acceptable, noted one branchline is not tied in at this time.
|
Sprinkler Plan Check | 6/19/2007 | | 7/2/2007 | | PASS |
|
|
|
*As---built plans are approved 07/02/2007 by Bryan Johnson
|
Plan assigned to (SAM) | 6/8/2007 | | 6/27/2007 | | DONE |
|
|
|
Per Paul Marcolina, Troy Cobbley reviewed and approved revised sprinkler plans on 6/21/07. Scott A. indicated it would be okay to put this sprinkler permit in issue status. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/27/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 6/27/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | | | 6/21/2007 | | PASS |
|
|
|
6/8/07 subsequent to the building and alarm reviews, emailed Troy Cobbley to come into City office to review these plans.
|
FIR-Aging Inspection | 6/4/2007 | 6/4/2007 | 6/7/2007 | | DEFR |
Forrest France
|
|
|
|
Plan resubmittals received | | | 5/31/2007 | | DONE |
|
|
|
Plan resubmittal received.
|
Issue and Print Permit | | | 1/22/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/19/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/4/2007 | | 1/4/2007 | | PASS |
|
|
|
Reviewed 1/4/07 by T. Cobbley; stamped and signed 1/18/07 by S.Rogers.
|
Application received | | | 12/1/2006 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|