Fire Sprinkler: C9894 REVISED SCOPE: for FIR06-00959 modified 7/24/2007 to include work on various levels of all 4 "Areas" of Bldg 2 as follows (Refer to FP0.0 for boundaries of each of the 4 Areas):
SUB-FLOOR
AREA 1: INSTALL 27 NEW UPRIGHT FIRE SPRINKLER HEADS AND PIPING.
(NET WORK: + 27 FIRE SPRINKLER HEADS)
1ST FLOOR-CEILING
AREA 1: DEMO 94 SPRINKLER HEADS AND PIPING, INSTALL 62 NEW PENDANT FIRE SPRINKLER HEADS AND PIPING.
(NET WORK: - 32 FIRE SPRINKLER HEADS)
AREA 4: NONE
(NET WORK: + 0)
2ND FLOOR
AREA 1: DEMO 32 SPRINKLER HEADS AND PIPING, INSTALL 1 NEW PENDANT FIRE SPRINKLER HEAD AND PIPING,
AND INSTALL 17 NEW UPRIGHT FIRE SPRINKLER HEADS AND PIPING, AND INSTALL 1 NEW HSW FIRE SPRINKLER
HEAD AND PIPING.
(NET WORK: - 13 FIRE SPRINKLER HEADS)
AREA 2: DEMO 6 SPRINKLER HEADS AND PIPING, INSTALL 8 NEW UPRIGHT FIRE SPRINKLER HEADS AND PIPING.
(NET WORK: + 2 FIRE SPRINKLER HEADS)
AREA 3: DEMO 14 SPRINKLER HEADS AND PIPING, INSTALL 12 NEW UPRIGHT FIRE SPRINKLER HEADS AND PIPING.
(NET WORK: - 2 FIRE SPRINKLER HEADS)
AREA 4: INSTALL 1 NEW PENDANT FIRE SPRINKLER HEAD AND PIPING.
(NET WORK: + 1 FIRE SPRINKLER HEAD)
ROOF: NONE
(NET WORK: + 0)
(TOTAL NET WORK FOR FIR06-00959: - 17 SPRINKLER HEADS)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/10/20078/14/20078/14/2007APASS
DetailsForrest France
Corrections are complete, fire sprinkler permit finaled.
INSP-Final Inspection8/8/20078/9/20078/9/2007PPART
DetailsForrest France
Inspected remainder of permit scope work indicated on sheets FP 2.3.1, 2.2.4, 2.2.2, 2.2.3, and reinspection for items on 2.2.1. All areas are satisfactory with the exception of one missing head as noted on FP2.2.3.
INSP-Final Inspection8/3/20078/3/20078/3/2007PDEFR
DetailsForrest France
Rescheduled per conversation with contractor.
INSP-Final Inspection7/31/20078/3/20078/3/2007ACANC
DetailsForrest France
Final bay 10 Phone #: ###-#### Internet Inspection Request from: Greg Kirkes Inspection cancelled from web by: Greg Kirkes
INSP-Final Inspection7/26/20078/2/20077/31/2007ACANC
DetailsForrest France
final for sprinkler bay 10 Phone #: ###-#### Internet Inspection Request from: Greg Kirkes Inspection cancelled from web by: Greg Kirkes
INSP-Final Inspection7/24/20077/26/20077/26/2007APART
DetailsForrest France
Fire sprinkler install is approved for sheets FP 2.0.1,2.1.1,2.1.4, one head is blocked by ductwork & one hallway head is missing an escutcheon-see sheet FP 2.2.1 for locations, corrections required for sheet FP2.1.1 are satisfactory, remainder of work indicated on sheets FP2.3.1,2.2.4,2.2.2,2.2.3 is not yet completed.
INSP-Sprinkler Rough-in/Hydro7/19/20077/24/20077/24/2007APART
DetailsForrest France
Plan review for resubmittals completed at city hall.
Sprinkler Plan Check7/24/2007 7/24/2007 PASS
Review of resubmitted plans; approved subject to satisfactory inspection.Single set of plans submitted, passed along to F. France for on-site inspection.
Plan resubmittals received  7/23/2007  
Sheets FP0.0, FPD2.1.1, FPD2.2.1, FPD2.2.2, FPD2.2.3, FP2.0.1, FP2.1.1, FP2.1.4, FP2.2.1, FP2.2.2, FP2.2.3, FP2.2.4, FP2.3.1, FP6.1, FP6.2, FP0.1, FPD2.0.2, FPD2.0.3, FPD2.1.2, FPD2.1.3, FP2.0.2, FP2.0.3, FP2.1.2, FP2.1.3, FP6.1, FP0.0, FP0.0, FPD2.0.2, FPD2.0.3, FPD2.1.1, FPD2.1..1, FPD2.1.2, FPD2.1.3, FPD2.2.1, FPD2.2.2, FPD2.2.3, FP2.0.1, FP2.0.2, FP2.0.3, FP2.1.1, FP2.1.2, FP2.1.3, FP2.1.4, FP2.2.1, FP2.2.2., FP2.2.3, FP2.2.4, FP2.3.1, FP6.1, FP6.2 For revised scope for FIR 06-00959 & FIR07-00553 and taken to Sam Rogers 7/23/07 BAS
INSP-Sprinkler Rough-in7/16/20077/16/20077/16/2007APART
DetailsForrest France
See areas approved for cover on the stamped plan set.
INSP-Sprinkler Rough-in/Hydro7/12/20077/13/20077/13/2007PPART
DetailsForrest France
Red lined areas on approved plans where the OH install is okay for cover, noted one pendent does not match response type-location indicated on plans.
Sprinkler Plan Check  7/12/2007 DONE
Discussed permit modifications that Micron intends to make with P. Marcolina and Steve Murdock; sprinkler plans need to be revised prior to inspection to split out Bay 10 from the rest of Bldg 2 which Micron plans to do under a new separate permit.
INSP-Sprinkler Rough-in7/5/20077/9/20077/9/2007APART
DetailsForrest France
Underfloor sprinklers are completed and approved, partial inspection for the OH-noted some items are not yet finished, field install has been modified from approved plans including 3" main relocation and pendents in lieu of uprights.
INSP-Sprinkler Rough-in7/2/20077/3/20077/3/2007PDEFR
DetailsForrest France
Inspection rescheduled per conversation with contractor.
INSP-Sprinkler Rough-in6/27/20076/29/20077/2/2007APART
DetailsForrest France
Inspection for the underfloor fire sprinklers is acceptable, noted one branchline is not tied in at this time.
Sprinkler Plan Check6/19/2007 7/2/2007 PASS
*As---built plans are approved 07/02/2007 by Bryan Johnson
Plan assigned to (SAM)6/8/2007 6/27/2007 DONE
Per Paul Marcolina, Troy Cobbley reviewed and approved revised sprinkler plans on 6/21/07. Scott A. indicated it would be okay to put this sprinkler permit in issue status. JCM
PLANS/APPL TAKEN TO FRONT DESK  6/27/2007 DONE
Issue and Print Permit  6/27/2007 DONE
Sprinkler Plan Check  6/21/2007 PASS
Details
6/8/07 subsequent to the building and alarm reviews, emailed Troy Cobbley to come into City office to review these plans.
FIR-Aging Inspection6/4/20076/4/20076/7/2007 DEFR
DetailsForrest France
Plan resubmittals received  5/31/2007 DONE
Plan resubmittal received.
Issue and Print Permit  1/22/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  1/19/2007 DONE
Sprinkler Plan Check1/4/2007 1/4/2007 PASS
Reviewed 1/4/07 by T. Cobbley; stamped and signed 1/18/07 by S.Rogers.
Application received  12/1/2006 DONE