INSP-Final Inspection | 4/19/2007 | 4/20/2007 | 4/20/2007 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled, inspection passed.
|
INSP-Final Inspection | 3/21/2007 | 3/22/2007 | 3/26/2007 | A | PART |
Forrest France
|
|
|
Permit final pending ceiling tile and escutcheon installation.
|
INSP-Final Inspection | 2/14/2007 | 2/14/2007 | 2/14/2007 | P | CANC |
Troy Cobbley
|
|
|
Project was not ready for an inspection.
|
INSP-Sprinkler Rough-in/Hydro | 2/9/2007 | 2/12/2007 | 2/12/2007 | A | PART |
Troy Cobbley
|
|
|
The sprinkler piping above the lay-in ceiling tile area is ok to cover. I have a concern with coverage in a ceiling pocket near the under the stairs. Per a conversation with Randy sprinkler protection will be provided there.
|
Sprinkler Plan Check | 12/18/2006 | | 12/18/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/18/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/18/2006 | | 12/18/2006 | | DONE |
|
|
|
|
Telephone call | | | 12/18/2006 | | DONE |
|
|
|
t/c w Liz at DeBest Fire ###-#### - permit ready and fees given ($150.00)
|
Permit Ready to Issue | | | 12/18/2006 | | DONE |
|
|
|
|
Issue and Print Permit | | | 12/18/2006 | | DONE |
|
|
|
|
Application received | | | 12/15/2006 | | |
|
|
|
|
Pending Assignment by SAM | 12/15/2006 | | | | |
|
|
|
|