INSP-Final Inspection | 9/19/2007 | 9/20/2007 | 9/20/2007 | A | PASS |
Forrest France
|
|
|
Final inspection passed, supply line flushed, double check backflow to be certified today, one missing escutcheon installed and travel cap at the ssu at the riser removed while on site, also need to install a test orifice at the inspectors test connection.
|
INSP-Final Inspection | 9/19/2007 | 9/19/2007 | 9/19/2007 | P | CANC |
Forrest France
|
|
|
mike Phone #: ###-#### rescheduled for tomarrow morning
|
INSP-Sprinkler Rough-in | 1/25/2007 | 1/26/2007 | 1/26/2007 | P | PART |
Forrest France
|
|
|
Overhead fire sprinkler install is approved for cover.
|
INSP-Sprinkler Rough-in | 1/17/2007 | 1/18/2007 | 1/18/2007 | A | PART |
Forrest France
|
|
|
OH rough-in inspection is acceptable pending the addition of a head at the riser within 1' of the exposed CPVC, missing batt insulation at two 1" riser pc. locations, the second floor loft/bedroom above the garage lacks piping cold cavity protection at this time.
|
Issue and Print Permit | | | 1/10/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/9/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/9/2007 | | 1/9/2007 | | DONE |
|
|
|
|
Telephone call | | | 1/9/2007 | | DONE |
|
|
|
lft vm with grg johnson ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 1/9/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 12/19/2006 | | 1/5/2007 | | FAIL |
|
|
|
Plan reviewed failed by Bryan Johnson
|
Application received | | | 12/19/2006 | | |
|
|
|
|
Sprinkler Plan Check | 1/6/2007 | | 1/9/2006 | | PASS |
|
|
|
Plan review by Bryan Johnson - Rev 1
|
Pending Assignment by SAM | 12/19/2006 | | | | |
|
|
|
|