INSP-Final Inspection | 5/1/2007 | 5/1/2007 | 5/1/2007 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 5/1/2007 | 5/1/2007 | 5/1/2007 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Alarm Testing | 3/22/2007 | 3/23/2007 | 3/23/2007 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with dave hannimans permission until items as noted by mike timmermans inspection have been corrected.
|
Issue permit | | | 1/4/2007 | | DONE |
|
|
|
|
Plan assigned to (Mike) | 12/21/2006 | | 12/28/2006 | | PASS |
|
|
|
12/28/2006 12:18:38 MWT - activity updated through activity FIRA22 from case FIR06-01000.
|
Alarm Plan Check | 12/28/2006 | | 12/28/2006 | | PASS |
|
|
|
Fire Alarm Review 1st
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/28/2006 | | |
|
|
|
Ready for Issue
|
Inspection Record Card- Fire | 12/28/2006 | | 12/28/2006 | | DONE |
|
|
|
|
Telephone call | | | 12/28/2006 | | DONE |
|
|
|
t/c w ben at peak alarm ###-#### - permit ready and fees given ($179.40)
|
Permit Ready to Issue | | | 12/28/2006 | | DONE |
|
|
|
|
Case Summary | | | 12/21/2006 | | |
|
|
|
|
Application received | | | 12/21/2006 | | |
|
|
|
|
Inspection | 3/23/2007 | 3/23/2007 | | | PASS |
|
|
|
Conducted fire alarm system inspection with Randy (Peak Alarm), Found a couple of notification appliances that required the candela settings to be increased. Also, the Duct Smoke Detectors were not installed because each unit serves separate areas and the units have ducted returns. (Non Plenum) The three HVAC roof top units are less than 2000 CFM. Alarm system notification appliance EOL voltage tested OK Batteries are two years old.
Signed temporary side of inspection card, consulted with Troy about the fact the existing FACP supervisory signals are latching and there is not supervisory LED on the FACP. The LCD display does describe the input as a supervisory input and the central station does receive the signal as a supervisory signal.
|