Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberFIR06-01019
StatusVoid/No Violation
Name DEBEST FIRE PROTECTION
Site Address 105 N 10TH ST
Project NameSPR-Take 5 / GEM NOBLE BLDG
Customer Number 
ePlanReview 
Description
(TAKE 5 HAIR SALON - GEM NOBLE BLDG - 1ST STORY) This building will be fire sprinklered for building area increase and for story increase. To remodel an existing 695 square foot hair salon tenant space. This space is located on the 1st story (near the Northeast corner) of an existing 2 story with basement historic building (11,400 square foot basement, 11,400 square foot 1st story, 11,500 square foot 2nd story). A permit to renovate the entire building (BLD04-01154) was issued on August 18, 2004. Work is to include interior nonbearing walls, a restroom accessible to the disabled, and interior finishes. The work shall comply with the approved drawings, the plan review report, and all applicable codes. The fire sprinkler system that will be installed under the renovation permit shall comply with NFPA 13 as regulated by the Fire Department. **CJW** DeBest fire protection to add one SSP to accomodate tenant modification and correct sprinkler spacing deficiency.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permit VOIDED5/22/20095/22/20095/22/2009 DONE
DetailsTisha Gallop
new contractor took over job see Fir09-00236
FIR-Aging Inspection6/7/20076/7/20076/7/2007 DONE
DetailsForrest France
Work in progress.
Issue and Print Permit  12/29/2006 DONE
Sprinkler Plan Check12/28/2006 12/28/2006 DONE
PLANS/APPL TAKEN TO FRONT DESK  12/28/2006 DONE
Inspection Record Card- Fire12/28/2006 12/28/2006 DONE
Telephone call  12/28/2006 DONE
t/c w liz at debest fire ###-#### - permit ready and fees given ($150.00)
Permit Ready to Issue  12/28/2006 DONE
Application received  12/27/2006  
Pending Assignment by SAM12/27/2006