Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR07-00002
StatusFinaled
Name ST LUKES REG MED CNTR
Site Address 100 E IDAHO ST Unit: 203
Project NameST LUKES-2ND FLR SOUTH
Customer Number 
ePlanReview 
Description
This permit is to provide audible visual notification devices in a tenant improvement area located on the 2ND floor of the Saint Lukes Regional Medical Center South Tower. Building permit # BLD06-03206 is to remodel a 512 sq.ft area for a new Drs. Office. Work includes selective interior demolition; installation of new 20 minute fire rated, "S" labeled smoke and draft control door & frame assembly for new 3' X 7' door between existing 1-hour exit corridor and new waiting area and a 3/4 hour rated sidelite in steel frame; to install new suspended ceiling grid system; new cabinetry with accessibility code compliance; upgrade electrical, mechanical, plumbing, sprinkler and alarm systems to meet tenant needs and for minimum compliance with current adopted Boise City codes and ordinances. Separate applications, plans, approval & permits are required for suppression and alarm permit as regulated by the fire department before any work on said systems can be performed. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/21/20073/22/20073/22/2007APASS
DetailsForrest France
Necessary corrections have been made, final alarm inspection passed.
INSP-Final Inspection3/15/20073/16/20073/16/2007AFAIL
DetailsForrest France
Horns did not function properly during alarm test.
Issue and Print Permit  1/12/2007 DONE
Inspection Record Card- Fire1/11/2007 1/11/2007 DONE
Telephone call  1/11/2007 DONE
left vm for charlie bayne at ###-#### - permit ready and fees given ($150.00)
Permit Ready to Issue  1/11/2007 DONE
Plan assigned to (Mike)1/2/2007 1/10/2007 PASS
1/10/2007 16:39:10 MWT - activity updated through activity FIRA22 from case FIR07-00002.
Alarm Plan Check1/10/2007 1/10/2007 PASS
Ready For Issue
PLANS/APPL TAKEN TO FRONT DESK  1/10/2007  
Ready for Issue
Application received  1/2/2007