Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR07-00028
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 1112 W MAIN ST Unit: 406
Project NameROYAL PLAZA
Customer Number 
ePlanReview 
Description
This TI in suite #406 includes dropping 23 residential heads into the new wall and ceiling layout of the dwelling unit and 3 other Dry SSP heads on the terrace. The work shall be performed in accordance with NFPA13R installation guidelines. This building is fully fire sprinklered for one-hour substitution. The fire sprinkler system work shall comply with IFC 2003, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD6-03307.
When tenant work affects fire sprinkler protection outside the permitted work area due to the installation of tenant-demising or new partition walls, the affected area sprinkler coverage outside the BLD permit will fall under the Fire Permit scope of work, to maintain the required fire protection within the fire sprinklered facility. The "Riser" and its supplies which include all appurtenances (including tamper, alarm and alarm monitoring) relating to the normal and correct function and integrity of this system will fall under the jurisdiction for code compliant verification
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/30/200712/3/200712/3/2007APASS
DetailsForrest France
Fire sprinkler work passed final inspection, noted one missing escutcheon at the terrace to be installed today, permit finaled.
INSP-Sprinkler Rough-in/Hydro10/25/200710/26/200710/29/2007PPART
DetailsForrest France
Hydro test passed.
FIR-Aging Inspection6/15/20076/15/20076/18/2007 DONE
DetailsForrest France
Under construction, work in progress.
Permit Ready to Issue  2/22/2007 DONE
Telephone call  2/22/2007 DONE
call to lilly to p/u permit and fees $150
Issue and Print Permit  2/22/2007 DONE
Inspection Record Card- Fire1/22/2007 1/22/2007 DONE
Sprinkler Plan Check1/8/2007 1/19/2007 PASS
Plan review by Bryan Johnson (Note: bld permit is being rev unable to issue this permit intil bld issued)
Application received  1/8/2007  
Pending Assignment by SAM1/8/2007