INSP-Final Inspection | 7/3/2007 | 7/5/2007 | 7/5/2007 | A | PASS |
Forrest France
|
|
|
Shell fire sprinkler permit is approved for final as noted.
|
INSP-Sprinkler Rough-in/Hydro | 5/29/2007 | 5/31/2007 | 5/31/2007 | A | PART |
Forrest France
|
|
|
Forward flow testing for the BFP and the class one standpipe roof connection completed acceptable.
|
INSP-Sprinkler Rough-in/Hydro | 5/18/2007 | 5/21/2007 | 5/21/2007 | A | PART |
Forrest France
|
|
|
1st floor overhead hydrostatic test passed.
|
INSP-Sprinkler Rough-in/Hydro | 5/10/2007 | 5/11/2007 | 5/14/2007 | A | DEFR |
Forrest France
|
|
|
Inspection rescheduled.
|
INSP-Sprinkler Rough-in | 4/25/2007 | 4/26/2007 | 4/26/2007 | A | PART |
Forrest France
|
|
|
Inspection for the 3rd floor rough-in is approved except as noted on stamped plans, overspaced heads above the west stairway, riser nipple at the SE corner, missing guage at the top west stairway standpipe hose connection.
|
INSP-Sprinkler Rough-in/Hydro | 4/17/2007 | 4/18/2007 | 4/18/2007 | A | PART |
Forrest France
|
|
|
1st floor OH rough-in is acceptable, noted flexible couplings are to be installed where pipe passes through non-frangible construction and no seismic clearance is provided, attatchment method at one lateral brace needs to be changed as the beam clamp used is not listed for this purpose.
|
INSP-Sprinkler Rough-in/Hydro | 4/11/2007 | 4/12/2007 | 4/12/2007 | A | PART |
Forrest France
|
|
|
OH rough-in for the second floor and basement are satisfactory, noted retaining straps at the beam clamps on the 2nd floor are not intended to be attatched to the ATR hangers, corrections in the basement are complete, riser is not yet finished, basement main as installed is 3", plan shows 21/2".
|
INSP-Sprinkler Rough-in/Hydro | 4/5/2007 | 4/6/2007 | 4/6/2007 | A | PART |
Forrest France
|
|
|
Cursory inspection of the basement overhead rough-in, contractor could not locate approved plans on site, noted two SW heads which exceed min. spacing allowance, need to reinspect with stamped plan set on site as required.
|
INSP-Supply line flush | 3/20/2007 | 3/21/2007 | 3/21/2007 | A | PART |
Forrest France
|
|
|
Inspection intended for project related supply line work.
|
INSP-Sprinkler Rough-in/Hydro | 3/16/2007 | 3/19/2007 | 3/19/2007 | A | DEFR |
Forrest France
|
|
|
Inspection request intended for project related UG permit.
|
Issue and Print Permit | | | 2/13/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/12/2007 | | |
|
|
|
|
Inspection Record Card- Fire | 2/12/2007 | | 2/12/2007 | | DONE |
|
|
|
|
Telephone call | | | 2/12/2007 | | DONE |
|
|
|
tlk to jim ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 2/12/2007 | | |
|
|
|
|
Sprinkler Plan Check | 2/1/2007 | | 2/9/2007 | | PASS |
|
|
|
Plan review by Bryan Johson
|
Plan resubmittals received | | | 2/1/2007 | | |
|
|
|
|
Application received | | | 1/9/2007 | | |
|
|
|
|
Pending Assignment by SAM | 1/9/2007 | | | | |
|
|
|
|