Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR07-00034
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 415 -419 S 8TH ST
Project NameO W SMITH/R GREY BLDG
Customer Number 
ePlanReview 
Description
Install a wet pipe sprinkler system through out the shell & Core of this structure in accordance with NFPA13. Install a Class I combination standpipe system in accordance with NFPA14. The fire sprinkler system & Standpipe work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD06-00845. This permit is also attached to permit FIR06-01010 / Under Ground Work.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/3/20077/5/20077/5/2007APASS
DetailsForrest France
Shell fire sprinkler permit is approved for final as noted.
INSP-Sprinkler Rough-in/Hydro5/29/20075/31/20075/31/2007APART
DetailsForrest France
Forward flow testing for the BFP and the class one standpipe roof connection completed acceptable.
INSP-Sprinkler Rough-in/Hydro5/18/20075/21/20075/21/2007APART
DetailsForrest France
1st floor overhead hydrostatic test passed.
INSP-Sprinkler Rough-in/Hydro5/10/20075/11/20075/14/2007ADEFR
DetailsForrest France
Inspection rescheduled.
INSP-Sprinkler Rough-in4/25/20074/26/20074/26/2007APART
DetailsForrest France
Inspection for the 3rd floor rough-in is approved except as noted on stamped plans, overspaced heads above the west stairway, riser nipple at the SE corner, missing guage at the top west stairway standpipe hose connection.
INSP-Sprinkler Rough-in/Hydro4/17/20074/18/20074/18/2007APART
DetailsForrest France
1st floor OH rough-in is acceptable, noted flexible couplings are to be installed where pipe passes through non-frangible construction and no seismic clearance is provided, attatchment method at one lateral brace needs to be changed as the beam clamp used is not listed for this purpose.
INSP-Sprinkler Rough-in/Hydro4/11/20074/12/20074/12/2007APART
DetailsForrest France
OH rough-in for the second floor and basement are satisfactory, noted retaining straps at the beam clamps on the 2nd floor are not intended to be attatched to the ATR hangers, corrections in the basement are complete, riser is not yet finished, basement main as installed is 3", plan shows 21/2".
INSP-Sprinkler Rough-in/Hydro4/5/20074/6/20074/6/2007APART
DetailsForrest France
Cursory inspection of the basement overhead rough-in, contractor could not locate approved plans on site, noted two SW heads which exceed min. spacing allowance, need to reinspect with stamped plan set on site as required.
INSP-Supply line flush3/20/20073/21/20073/21/2007APART
DetailsForrest France
Inspection intended for project related supply line work.
INSP-Sprinkler Rough-in/Hydro3/16/20073/19/20073/19/2007ADEFR
DetailsForrest France
Inspection request intended for project related UG permit.
Issue and Print Permit  2/13/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  2/12/2007  
Inspection Record Card- Fire2/12/2007 2/12/2007 DONE
Telephone call  2/12/2007 DONE
tlk to jim ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  2/12/2007  
Sprinkler Plan Check2/1/2007 2/9/2007 PASS
Plan review by Bryan Johson
Plan resubmittals received  2/1/2007  
Application received  1/9/2007  
Pending Assignment by SAM1/9/2007