INSP-Final Inspection | 1/16/2008 | 1/17/2008 | 1/17/2008 | A | PASS |
Forrest France
|
|
|
Verified as-built drawings, final pending light fixture obstruction as noted.
|
INSP-Final Inspection | 1/10/2008 | 1/11/2008 | 1/14/2008 | A | FAIL |
Forrest France
|
|
|
As-built drawings do not match the floor plan, one head has been deleted, one head at the master bedroom is obstructed by a surface mounted light fixture.
|
INSP-Sprinkler Rough-in/Hydro | 1/10/2008 | 1/10/2008 | 1/10/2008 | P | CANC |
Forrest France
|
|
|
Jonathon is contact Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Final Inspection | 12/14/2007 | 12/17/2007 | 12/17/2007 | A | FAIL |
Forrest France
|
|
|
As-built plans are not accurate, one head is shown with no piping attatched, two heads are spaced incorrecty, missing head located in a closet next to the front door.
|
INSP-Final Inspection | 11/30/2007 | 12/3/2007 | 12/3/2007 | A | PART |
Forrest France
|
|
|
Install is satisfactory, final pending as-built plans for field mods. and floor plan changes.
|
INSP-Sprinkler Rough-in/Hydro | 10/25/2007 | 10/26/2007 | 10/29/2007 | P | PART |
Forrest France
|
|
|
Hydro test passed.
|
FIR-Aging Inspection | 6/21/2007 | 6/21/2007 | 6/22/2007 | | DONE |
Forrest France
|
|
|
Work in progress.
|
Permit Ready to Issue | | | 2/22/2007 | | DONE |
|
|
|
|
Telephone call | | | 2/22/2007 | | DONE |
|
|
|
call to lilly to p/u permit and fees $150
|
Issue and Print Permit | | | 2/22/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/22/2007 | | 1/22/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/9/2007 | | 1/22/2007 | | PASS |
|
|
|
Plan review by Bryan Johnson (cant release this permit until bld permit is picked up and paid)
|
Application received | | | 1/9/2007 | | |
|
|
|
|
Pending Assignment by SAM | 1/9/2007 | | | | |
|
|
|
|