INSP-Final Inspection | 3/19/2007 | 3/19/2007 | 3/19/2007 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 2/28/2007 | 3/1/2007 | 3/1/2007 | P | PART |
Troy Cobbley
|
|
|
Piping is ok to cover. One item that needs correct is the hanger rings that attach to the trapeze member are smaller in size than the pipe that they are supporting. These rings needs to be atleast 2 1/2" in size. This will be checked at the final.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/5/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/5/2007 | | 2/5/2007 | | DONE |
|
|
|
|
Telephone call | | | 2/5/2007 | | |
|
|
|
tlk to liz for randy bowron ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 2/5/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/5/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/19/2007 | | 2/2/2007 | | PASS |
|
|
|
Plan review by Bryan Johnson
|
Plan resubmittals received | | | 1/30/2007 | | |
|
|
|
|
Application received | | | 1/19/2007 | | |
|
|
|
|
Pending Assignment by SAM | 1/19/2007 | | | | |
|
|
|
|