INSP-Final Inspection | 5/19/2009 | 5/19/2009 | 5/20/2009 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
|
INSP-Sprinkler Rough-in | 5/6/2009 | 5/7/2009 | 5/7/2009 | A | PART |
Forrest France
|
|
|
See annotations and initials with today's date on plan set for the remainder of overhead work inspected and approved for cover per the permit scope. Final pending ceiling tiles and escutcheons.
|
INSP-Sprinkler Rough-in/Hydro | 5/4/2009 | 5/4/2009 | 5/4/2009 | A | FAIL |
Troy Cobbley
|
|
|
I repeadedly tried to contact don by phone and I also wandered the ground and the basement floors looking for the project site.
|
INSP-Sprinkler Rough-in | 4/30/2009 | 5/1/2009 | 5/1/2009 | A | NH |
Forrest France
|
|
|
Per contractor missing plans on site, will reschedule as discussed.
|
INSP-Sprinkler Rough-in/Hydro | 6/16/2008 | 6/16/2008 | 6/16/2008 | P | PART |
Forrest France
|
|
|
See approved plans for areas good for cover at hard lid and drop ceilings.
|
INSP-Sprinkler Rough-in | 5/27/2008 | 5/28/2008 | 5/28/2008 | A | PART |
Forrest France
|
|
|
Approved for ceiling cover at the rooms initialed and annotated on stamped plan set, see as-built drawings for accurate floorplan and head layout also initialed with today's date.
|
INSP-Sprinkler Rough-in | 2/29/2008 | 3/3/2008 | 3/3/2008 | A | PART |
Forrest France
|
|
|
See areas marked with today's date on approved plans okayed for cover, field modifications due to floor plan changes accepted.
|
INSP-Sprinkler Rough-in | 8/7/2007 | 8/8/2007 | 8/8/2007 | A | PART |
Forrest France
|
|
|
See approved plans for areas inspected and okayed for cover at the drop ceilings.
|
INSP-Sprinkler Rough-in | 3/2/2007 | 3/5/2007 | 3/5/2007 | A | PART |
Forrest France
|
|
|
Fire sprinkler install at the north portion of the remodel as noted on approved plan set is okay for cover.
|
INSP-Sprinkler Rough-in | 2/28/2007 | 3/1/2007 | 3/1/2007 | A | CANC |
Forrest France
|
|
|
To be rescheduled per agreement.
|
Inspection Record Card- Fire | 2/26/2007 | | 2/26/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/26/2007 | | DONE |
|
|
|
|
Telephone call | | | 2/26/2007 | | DONE |
|
|
|
lft vm with brodie ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 2/26/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/26/2007 | | |
|
|
|
|
Sprinkler Plan Check | 2/20/2007 | | 2/23/2007 | | PASS |
|
|
|
Plans are approved by Bryan Johson
|
Plan resubmittals received | | | 2/20/2007 | | |
|
|
|
|
Sprinkler Plan Check | 1/31/2007 | | 2/8/2007 | | FAIL |
|
|
|
plans failed by BJ- available for pick-up.
|
Sprinkler Plan Check | 1/31/2007 | | 2/8/2007 | | FAIL |
|
|
|
Reviewed by BJ; failed plans available for pickup by contractor.
|
Application received | | | 1/23/2007 | | |
|
|
|
|
Case Summary | | | 1/23/2007 | | DONE |
|
|
|
|
Pending Assignment by SAM | 1/23/2007 | | | | |
|
|
|
|