Relocate 38 SSP heads & add 2 SSU heads to accommodate a new wall and ceiling layout in an existing Office area. The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD06-03094. When tenant work affects fire sprinkler protection outside the permitted work area due to the installation of tenant-demising or new partition walls, the affected area sprinkler coverage outside the BLD permit will fall under the Fire Permit scope of work, to maintain the required fire protection within the fire sprinklered facility. The “Riser” and its supplies which include all appurtenances (including tamper, alarm and alarm monitoring) relating to the normal and correct function and integrity of this system will fall under the jurisdiction for code compliant verification.The Revised Scope of Work:
Removed the down heads in the office area and reestablish the upright protection as shown on sheet FP-2. Two heads will also be added at the mezzanine to meet spacing requirements. A total of 49 heads are affected by this revision.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary  11/3/2008  
INSP-Final Inspection6/19/20076/20/20076/20/2007APASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in/Hydro5/3/20075/3/20075/3/2007APASS
DetailsTroy Cobbley
The remaining areas are ok to cover. Two hangers have been removed and the locations marked on the plans. I will check these at the final.
INSP-Sprinkler Rough-in/Hydro4/30/20074/30/20074/30/2007PPASS
DetailsTroy Cobbley
Sprinkler piping is ok to cover in locations as marked on the city approved plans.
(F) Reprint permit  4/30/2007 DONE
CHANGE STATUS TO (ISS)  4/30/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/26/2007 DONE
Telephone call  4/26/2007 DONE
tlk to tom dutkus ###-#### that permit and fees are ready to be picked up
Inspection Record Card- Fire4/26/2007 4/26/2007 DONE
Permit Ready to Issue  4/26/2007  
Inspection Record Card- Fire4/26/2007 4/26/2007 DONE
Sprinkler Plan Check4/16/2007 4/23/2007 PASS
Revised plans are approved by Bryan Johnson
Plan resubmittals received  4/16/2007 DONE
Received Fire Sprinkler resubmittal application, and 4 copys sheets FP-1 OF 2 and 4 copys of ref sheets sent to fire///dld
Issue permit  2/6/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  2/5/2007 DONE
Inspection Record Card- Fire2/5/2007 2/5/2007 DONE
Telephone call  2/5/2007  
tlk to tom dutkus ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  2/5/2007 DONE
Sprinkler Plan Check1/25/2007 2/2/2007 PASS
Plan review by Bryan Johnson are approved as submitted
Case Summary  1/29/2007 DONE
Application received  1/29/2007  
Pending Assignment by SAM1/29/2007