First Floor) To remove 20 existing SSU fire sprinkler heads and piping from Dock B24. Re-install 57 new SSU heads and piping to expand to Dock 24A. Also to install 37 new heads in Net Wok to accommodate the upgrade.
" (Second Floor) Install 18 new SSU fire sprinkler heads and piping in Dock B24. Install 18 new heads in the Net Work and 55 new heads in the Project Net Woks areas to accommodate the upgrade. This fire protection work shall comply with the IFC 2003 and the permit review comments; each regulated by the Fire Chief. The review comments, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permitted work is attached to building permit BLD06-03584.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/11/20081/15/20081/15/2008APASS
DetailsForrest France
Fire sprinkler permit finaled.
INSP-Sprinkler Rough-in/Hydro10/9/200710/15/200710/15/2007APART
DetailsForrest France
Hydrostatic test for the 2nd and 1st floor completed areas passed, noted pending resubmittals and ordinary temp heads at the vicinity of unit heaters need to be changed.
INSP-Sprinkler Rough-in/Hydro10/9/200710/10/200710/9/2007ACANC
DetailsForrest France
Phone #: ###-#### Internet Inspection Request from: Greg Kirkes Inspection to be rescheduled per conversation with contractor.
Issue and Print Permit  7/18/2007 DONE
Permit Ready to Issue  7/12/2007 DONE
Inspection Record Card- Fire2/20/2007 2/20/2007 DONE
Miscellaneous action  2/20/2007 DONE
One set of plans is being retained for the city records. I have the 2nd set of plans to take back to Micron at next site visit. The Building plans are still under review at this time.
Application received  2/5/2007  
Pending Assignment by SAM2/5/2007    
Sprinkler Plan Check2/20/2007   PASS
Plan review by Bryan Johson (Cant release this permit until Bld Permit is picked up)