INSP-Final Inspection | 3/20/2007 | 3/21/2007 | 3/21/2007 | A | PASS |
Forrest France
|
|
|
Required corrections are verified for completion, fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 3/13/2007 | 3/14/2007 | 3/14/2007 | A | PASS |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover but one hanger infront of the refrigerator is attached to duct work and will need to be relocated to the building structure.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/14/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/14/2007 | | DONE |
|
|
|
|
Application received | | | 2/8/2007 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|
Sprinkler Plan Check | 2/8/2007 | | 2/8/2007 | | PASS |
|
|
|
on site review/approval by TC.
|