Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR07-00136
StatusFinaled
Name AMERICAN FIRE PROTECTION LLC
Site Address 245 S CAPITOL BLVD
Project NameSPR-GROVE HOTEL-Boise Burn
Customer Number 
ePlanReview 
Description
(BOISE BURN OFFICE - GROVE HOTEL / QWEST ARENA - 4TH STORY) This building is fire sprinklered for high-rise. To expand an existing 2,629 square foot tenant space by about 2,138 square feet into an adjacent area. This space is located on the 4 story of the Grove Hotel. After the expansion, this tenant space will have a total floor area of about 4,767 square feet. Work is to include interior nonbearing walls, interior doors, suspended ceilings, counter/guard, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW** American Fire Protection to modify the existing overhead sprinkler system by adding 15 SSP's where required within new tenant space.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/19/20074/20/20074/20/2007APASS
DetailsForrest France
Plan resubmittals verified, final fire sprinkler inspection passed, permit finaled.
Issue and Print Permit  3/26/2007 DONE
Plan assigned to (Scott)3/21/2007 3/22/2007 PASS
Updated case summary. Plans approved as noted.
Sprinkler Plan Check3/22/2007 3/22/2007 PASS
Modifications approved.
PLANS/APPL TAKEN TO FRONT DESK  3/22/2007  
Permit Ready to Issue  3/22/2007 DONE
Inspection Record Card- Fire3/22/2007 3/22/2007 DONE
Telephone call  3/22/2007  
call to jim danes, left msg on ans mach, permits ready to p/u no fee
Plan resubmittals received  3/21/2007  
Received fire sprinkler app, TI cover sheet, 4 pages of plans (8 1/2" x 11"), and information on product; taken to fire review
INSP-Sprinkler Rough-in/Hydro3/19/20073/20/20073/20/2007APART
DetailsTroy Cobbley
The sprinkler piping in the office areas is ok to cover but the upright sprinkler heads shown on the drawings in the storage area are not installed. Per the fitter this is outside his scope of work. I told him the heads appear to be overspaced and since it is on the drawings it is in the scope of work. Either the work will need to be done or plans resubmitted to change the scope of work.
Issue and Print Permit  2/27/2007 DONE
Sprinkler Plan Check2/15/2007 2/15/2007 PASS
PLANS/APPL TAKEN TO FRONT DESK  2/15/2007 DONE
Inspection Record Card- Fire2/15/2007 2/15/2007 DONE
Permit Ready to Issue  2/15/2007 DONE
Telephone call  2/15/2007 DONE
CAL TO JIM DANES, permit ready to p/u fee $150
Case Summary  2/14/2007  
Application received  2/14/2007  
Pending Assignment by SAM2/14/2007