Case Summary | | | 12/9/2008 | | DONE |
|
|
|
|
INSP-Final Inspection | 2/13/2008 | 2/15/2008 | 2/15/2008 | A | PASS |
Forrest France
|
|
|
Fire sprinkler work passed final inspection, one missing escutcheon installed while on site, permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 10/25/2007 | 10/26/2007 | 10/29/2007 | P | PART |
Forrest France
|
|
|
Hydro test passed.
|
INSP-Sprinkler Rough-in | 9/4/2007 | 9/5/2007 | 9/5/2007 | A | PART |
Forrest France
|
|
|
OH install is approved for cover at the TI area.
|
INSP-Sprinkler Rough-in | 8/30/2007 | 8/31/2007 | 8/31/2007 | A | CANC |
Forrest France
|
|
|
Overbooked
|
FIR-Aging Inspection | 8/14/2007 | 8/14/2007 | 8/14/2007 | | DEFR |
Forrest France
|
|
|
Work in progress.
|
Issue and Print Permit | | | 4/4/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/2/2007 | | DONE |
|
|
|
|
Telephone call | | | 4/2/2007 | | DONE |
|
|
|
t/c w lilly at shilo ###-#### - permit ready and fees given ($150.00)
|
Inspection Record Card- Fire | 2/28/2007 | | 2/28/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/15/2007 | | 2/25/2007 | | PASS |
|
|
|
Plan are reviewed by Bryan Johnson
|
Application received | | | 2/15/2007 | | |
|
|
|
|
Pending Assignment by SAM | 2/15/2007 | | | | |
|
|
|
|