Case Summary | | | 11/3/2008 | | DONE |
|
|
|
|
INSP-Final Inspection | 1/4/2008 | 1/7/2008 | 1/7/2008 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 10/25/2007 | 10/26/2007 | 10/29/2007 | P | PART |
Forrest France
|
|
|
Hydro test passed.
|
INSP-Sprinkler Rough-in | 9/4/2007 | 9/5/2007 | 9/5/2007 | A | PART |
Forrest France
|
|
|
Rough-in at the hard lid ceilings is good for cover as noted.
|
INSP-Sprinkler Rough-in | 8/30/2007 | 8/31/2007 | 8/31/2007 | A | CANC |
Forrest France
|
|
|
Overbooked
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/31/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/31/2007 | | |
|
|
|
|
Telephone call | | | 5/31/2007 | | |
|
|
|
tlk to lilly at shilo ###-#### that permit and fees are ready to be picked up
|
Issue and Print Permit | | | 5/31/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/15/2007 | | 3/1/2007 | | DONE |
|
|
|
plans are approved as submitted by bryan johnson
note: bld. permit is being reviewed, unable to issue this permit unith the bld. permit has been issued
|
Inspection Record Card- Fire | 3/1/2007 | | 3/1/2007 | | DONE |
|
|
|
|
Application received | | | 2/15/2007 | | |
|
|
|
|
Pending Assignment by SAM | 2/15/2007 | | | | |
|
|
|
|