INSP-Final Inspection | 6/14/2007 | 6/14/2007 | 6/14/2007 | P | PASS |
Forrest France
|
|
|
UG fire supply line permit finaled.
|
INSP-Sprinkler Rough-in | 6/13/2007 | 6/14/2007 | 6/14/2007 | P | PART |
Forrest France
|
|
|
Dry system passed 24 hr. air testing.
|
INSP-Sprinkler Rough-in | 6/13/2007 | 6/13/2007 | 6/13/2007 | P | DONE |
Troy Cobbley
|
|
|
24 hr. pneumatic air test started at 12:50 with 44psi on the guage.
|
INSP-Supply line flush | 6/5/2007 | 6/6/2007 | 6/6/2007 | | DONE |
Troy Cobbley
|
|
|
See sam rogers inspection review comments for todays date.
|
INSP-Sprinkler Rough-in/Hydro | 6/6/2007 | 6/6/2007 | 6/6/2007 | | FAIL |
|
|
|
Conducted UG hydo and pressure held satisfactorily (233start-230 final) but after test, gage was pegged at 30 psi; test to be repeated tomorrow with new gage to ensure test pressure is correct; new inspection will be requested.
|
Inspection | 6/6/2007 | 6/6/2007 | 6/6/2007 | | DONE |
|
|
|
Witnessed satisfactory UG flushing.
|
Case Summary | | | 6/6/2007 | | |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 6/5/2007 | 6/5/2007 | 6/5/2007 | | PART |
Forrest France
|
|
|
UG hydrostatic test
|
INSP-Sprinkler Rough-in/Hydro | 3/12/2007 | 3/12/2007 | 3/12/2007 | P | PART |
Forrest France
|
|
|
UG fire supply line ductile riser stub and the first 20' out from the building are okay for cover.
|
Issue and Print Permit | | | 2/23/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/22/2007 | | 2/22/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/22/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/22/2007 | | 2/22/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/22/2007 | | DONE |
|
|
|
|
Telephone call | | | 2/22/2007 | | DONE |
|
|
|
call to jeff anderson, left msg on voice mail, permit ready to p/u and fees $150.
|
Application received | | | 2/16/2007 | | |
|
|
|
|