INSP-Final Inspection | 3/8/2007 | 3/9/2007 | 3/9/2007 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 3/5/2007 | 3/6/2007 | 3/6/2007 | P | PART |
Forrest France
|
|
|
The remainder of fire sprinkler mods are approved for cover, final pending ceiling tile and escutcheons.
|
INSP-Sprinkler Rough-in | 3/2/2007 | 3/5/2007 | 3/5/2007 | A | PART |
Forrest France
|
|
|
Fire sprinker modifications for room #3 are satisfactory, no access to room #4 at this time due to flooring installation.
|
INSP-Sprinkler Rough-in | 2/28/2007 | 3/1/2007 | 3/1/2007 | A | CANC |
Forrest France
|
|
|
To be rescheduled per phone call to contractor.
|
Issue and Print Permit | | | 2/27/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/26/2007 | | 2/26/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/26/2007 | | DONE |
|
|
|
|
Telephone call | | | 2/26/2007 | | |
|
|
|
call to brodie permit is ready to p/u.
|
Sprinkler Plan Check | 2/23/2007 | | 2/23/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/23/2007 | | DONE |
|
|
|
|
Application received | | | 2/21/2007 | | |
|
|
|
|