INSP-Final Inspection | 10/11/2007 | 10/11/2007 | 10/11/2007 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 3/22/2007 | 3/23/2007 | 3/23/2007 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 3/15/2007 | 3/16/2007 | 3/16/2007 | A | FAIL |
Troy Cobbley
|
|
|
No approved plans were on site. I also found multiple defieciencies such as booths with ceiling and no coverage, booths with cloth ceilings (need flame spread rate) and pendants located too close to the walls under the soffit that follows the exterior wall. Plans also do not include the work that is shown to be phase 1 work on the building plans. Resubmittals will be required prior to another inspection.
|
Issue permit | | | 3/7/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/6/2007 | | 3/6/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/6/2007 | | |
|
|
|
|
Permit Ready to Issue | | | 3/6/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/26/2007 | | 3/5/2007 | | PASS |
|
|
|
*Plans are approved as Submitted by Bryan Johnson
|
Case Summary | | | 2/26/2007 | | DONE |
|
|
|
|
Application received | | | 2/26/2007 | | |
|
|
|
|
Pending Assignment by SAM | 2/26/2007 | | | | |
|
|
|
|