INSP-Final Inspection | 5/15/2007 | 5/15/2007 | 5/15/2007 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. Additional head has been installed.
|
INSP-Final Inspection | 4/18/2007 | 4/18/2007 | 4/18/2007 | P | FAIL |
Forrest France
|
|
|
Pendent head in the utility/storage room is obstructed by adjacent ductwork.
|
INSP-Sprinkler Rough-in | 3/21/2007 | 3/21/2007 | 3/21/2007 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover. Larren had to relocate an armover as I waited.
|
Issue permit | | | 3/7/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/6/2007 | | 3/6/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/6/2007 | | DONE |
|
|
|
|
Telephone call | | | 3/6/2007 | | DONE |
|
|
|
lft ms with secretary for lannen bailey ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 3/6/2007 | | |
|
|
|
|
Sprinkler Plan Check | 2/27/2007 | | 3/5/2007 | | PASS |
|
|
|
Plans are approved as Submitted by Bryan Johnson
|
Case Summary | | | 2/27/2007 | | DONE |
|
|
|
|
Application received | | | 2/27/2007 | | |
|
|
|
|
Pending Assignment by SAM | 2/27/2007 | | | | |
|
|
|
|