Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberFIR07-00196
StatusFinaled
Name IDAHO FIRE PROTECTION
Site Address 201 N MAPLE GROVE RD
Project NameMesa Falls
Customer Number 
ePlanReview 
Description
Beginning at the property line, install a 6” C-900 underground service leading into the riser room. A wet pipe sprinkler system will serve through out the bldg. The exterior canopy at the Entryway will be protected by an auxiliary anti-freeze system.
The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD06-01784.Scope of Work:
Beginning at the property line, install a 6” C-900 underground service leading into the riser room. A wet pipe sprinkler system will serve through out the bldg. The exterior canopy at the Entryway will be protected by an auxiliary anti-freeze system. The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD06-01784.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/17/20077/18/20077/18/2007APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection7/16/20077/17/20077/17/2007PCANC
DetailsTroy Cobbley
Duplicate inspection for the hydro test
INSP-Sprinkler Rough-in/Hydro7/16/20077/17/20077/17/2007APASS
DetailsTroy Cobbley
Overhead hydro on the wet system passed.
INSP-Supply line flush7/12/20077/12/20077/13/2007PCANC
DetailsTroy Cobbley
Duplicate inspection
INSP-Supply line flush7/13/20077/13/20077/13/2007AFAIL
DetailsTroy Cobbley
United Water could not find the correct valves to turn on the underground supply. It turns out they are buried in the middle of the street with no road boxes for access. We agreed to return on Monday at 9:00 for a repeat.
INSP-Sprinkler Rough-in/Hydro7/12/20077/12/20077/12/2007PPASS
DetailsTroy Cobbley
The anti-freeze system and underground supply hydro test passed. I also did a life safety walk through with the general contractor.
Issue and Print Permit  6/7/2007  
PLANS/APPL TAKEN TO FRONT DESK  5/30/2007 DONE
Inspection Record Card- Fire5/30/2007 5/30/2007 DONE
Telephone call  5/30/2007  
tlk to tom dutkus ###-#### that permit and no fees are ready to picked up
Permit Ready to Issue  5/30/2007 DONE
Sprinkler Plan Check5/18/2007 5/29/2007 PASS
As Built Plans are approved per Bryan Johnson
Plan resubmittals received  5/18/2007  
INSP-Sprinkler Rough-in/Hydro5/4/20075/4/20075/4/2007PPASS
DetailsTroy Cobbley
Hydro test on the anti-freeze system passed. Rough in got a partial on the anti freeze system. Plans and hydraulic calculations will need to be resubmitted due to the changes in this area. I also let the general contractor know that the wall pockets will require sprinkler protection or meet the combustible concealed space requirements of NFPA 13. Per phone call from the architect it sounds like sheet rock will be installed to cover the wood which will be ok.
Issue permit  3/20/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/14/2007 DONE
Inspection Record Card- Fire3/14/2007 3/14/2007 DONE
Telephone call  3/14/2007  
tlk to tom dutkus ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  3/14/2007 DONE
Sprinkler Plan Check2/28/2007 3/8/2007 PASS
Plans are approved by Bryan Johnson
Application received  2/28/2007  
Pending Assignment by SAM2/28/2007