INSP-Final Inspection | 4/21/2010 | 4/27/2010 | 4/27/2010 | P | PASS |
Forrest France
|
|
|
Scope of fire sprinkler work field verified for completion, stamped plans reviewed, inspection passed- permit finaled.
|
INSP-Final Inspection | 4/14/2010 | 4/15/2010 | 4/15/2010 | P | DEFR |
Forrest France
|
|
|
Inspection intended to be scheduled for 4/16 per contractor.
|
Miscellaneous action | | | 3/11/2010 | | DONE |
|
|
|
Sent email requesting project status.
|
INSP-Final Inspection | 5/29/2007 | 5/30/2007 | 5/30/2007 | A | PART |
Forrest France
|
|
|
Inspection for the core lobby area and the restroom fire sprinkler work passed.
|
Inspection Record Card- Fire | 3/2/2007 | | 3/2/2007 | | DONE |
|
|
|
|
Telephone call | | | 3/2/2007 | | DONE |
|
|
|
left mess with charlie that permit is ready
|
Issue and Print Permit | | | 3/2/2007 | | DONE |
|
|
|
|
Application received | | | 3/1/2007 | | |
|
|
|
|
Sprinkler Plan Check | 3/1/2007 | | 3/1/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/1/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/2/2007 | | | | |
|
|
|
|