INSP-Final Inspection | 9/7/2007 | 9/7/2007 | 9/7/2007 | P | PASS |
Forrest France
|
|
|
Corrections accepted, fire sprinkler permit finaled.
|
INSP-Final Inspection | 7/18/2007 | 7/25/2007 | 7/25/2007 | P | FAIL |
Troy Cobbley
|
|
|
Inspection was for the fire pump test. I noted three items that are required per NFPA 20 section 5.12. Drainage, ventilation and emergency lighting. These items were posted on a correction notice in the riser room.
|
INSP-Final Inspection | 7/18/2007 | 7/25/2007 | 7/18/2007 | A | CANC |
Forrest France
|
|
|
PUMP TEST. PLEASE CALL JEFF PACKHAM IF THERE ARE QUESTIONS. Phone #: ###-#### Internet Inspection Request from: Jeff Packham Inspection cancelled from web by: Jeff Packham
|
INSP-Final Inspection | 7/11/2007 | 7/12/2007 | 7/12/2007 | A | PART |
Forrest France
|
|
|
Required corrections verified for completion, trip testing passed, resubmittals approved, final pending pump acceptance testing per NFPA 20.
|
Miscellaneous action | | | 7/12/2007 | | DONE |
|
|
|
picked up plans
|
INSP-Final Inspection | 7/10/2007 | 7/11/2007 | 7/11/2007 | A | PART |
Forrest France
|
|
|
Need curent resubmittals reflecting field modifications, remove plants blocking FDC and WPI, still need to complete trip testing, supervision and alarm tested okay.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/11/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/11/2007 | | 7/11/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/11/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/11/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 7/2/2007 | | 7/10/2007 | | PASS |
|
|
|
As built Plans & Calculation are approved by Bryan Johnson
|
INSP-Final Inspection | 7/5/2007 | 7/6/2007 | 7/6/2007 | P | FAIL |
Troy Cobbley
|
|
|
I did not perform the pump acceptance test since the pump representative was not there as required pernfpa 20 - 14.2. Brian Johnson and dave hanniman were consulted.
|
INSP-Sprinkler Rough-in/Hydro | 7/5/2007 | 7/6/2007 | 7/6/2007 | P | PASS |
Troy Cobbley
|
|
|
The 24 hour air test passed.
|
INSP-Sprinkler Rough-in/Hydro | 7/5/2007 | 7/5/2007 | 7/5/2007 | P | DEFR |
Forrest France
|
|
|
Scheduled by a contractor via Hello! on 7/5/2007 at 7:31:03 AM. Contact: ###-####.
|
INSP-Sprinkler Rough-in/Hydro | 7/3/2007 | 7/5/2007 | 7/5/2007 | A | PART |
Forrest France
|
|
|
Begin retest of the 24 hr. pneumatic for the roof level dry system at 12:30 pm with 44 1/2 psi at the guage.
|
INSP-Sprinkler Rough-in/Hydro | 7/2/2007 | 7/3/2007 | 7/3/2007 | A | CANC |
Forrest France
|
|
|
24 hour air test for 6" dry system. Phone #: ###-#### Internet Inspection Request from: Jeff Packham
|
Plan resubmittals received | | | 7/2/2007 | | |
|
|
|
1 letter of transmittal,1 application,5 copys of sheets FP-1,FP-2,FP-3,FP-4 sent to Scott A.
|
INSP-Sprinkler Rough-in/Hydro | 6/27/2007 | 6/27/2007 | 6/28/2007 | P | PART |
Forrest France
|
|
|
OH hydrostatic test completed satisfactory.
|
INSP-Sprinkler Rough-in/Hydro | 6/20/2007 | 6/21/2007 | 6/21/2007 | A | FAIL |
Forrest France
|
|
|
The roof dry system piping failed air test due to 4psi. loss at the guage, the lower and upper mezz. system air test passed with 1/2 psi. loss. Noted items for OH rough-in including one missing head at the upper mezz. NE stairs, locaiton of the main for both upper and lower mezz. has been moved from what the approved plans indicate, plans do not reflect outside drive thru piping or system feed for the office area, noted no QOD has been installed on the dry valve trim for the system over 500 gallons, no hose connections installed at this time, plants blocking FDC and WPI will need to be removed.
|
INSP-Sprinkler Rough-in/Hydro | 6/19/2007 | 6/20/2007 | 6/20/2007 | A | PART |
Forrest France
|
|
|
Begin dry sytem air test @ 45 psi. at 11:50 am.
|
INSP-Sprinkler Rough-in | 6/19/2007 | 6/20/2007 | 6/20/2007 | A | PART |
Forrest France
|
|
|
Begin dry system air test at 45psi.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/22/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/22/2007 | | 3/22/2007 | | DONE |
|
|
|
|
Telephone call | | | 3/22/2007 | | DONE |
|
|
|
tlk to jeff packham ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 3/22/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/22/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/5/2007 | | 3/16/2007 | | PASS |
|
|
|
Plans are approved w/attached comments per Bryan Johnson
|
Application received | | | 3/5/2007 | | |
|
|
|
|
Case Summary | | | 3/5/2007 | | |
|
|
|
|
Plan resubmittals received | | | 3/5/2007 | | DONE |
|
|
|
permit application (4 copies), cover sheet (4 copies), Idaho records storage Building and supporting documents (4 copies) and transmittal ltr (1), FP1 of 4 (4 copies), FP2 of 4 ( 4 copies), FP3 of 4 (4 copies), FP4 of 4 (4 copies).
|
Plan assigned to (Scott) | 3/5/2007 | | 3/5/2007 | | DONE |
|
|
|
|
Pending Assignment by SAM | 3/5/2007 | | | | |
|
|
|
|