INSP-Final Inspection | 5/4/2007 | 5/7/2007 | 5/7/2007 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 3/21/2007 | 3/26/2007 | 3/26/2007 | P | PART |
Forrest France
|
|
|
Corrections from previous inspection have been finished, need to install drop ceiling and escutcheons prior to final.
|
INSP-Sprinkler Rough-in/Hydro | 3/15/2007 | 3/16/2007 | 3/16/2007 | A | FAIL |
Forrest France
|
|
|
Static pressures above 100 psi. require hangers within 1' of the end on armovers supplying pendent sprinklers at the ATM lobby.
|
Permit Ready to Issue | | | 3/12/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/12/2007 | | 3/12/2007 | | DONE |
|
|
|
|
Telephone call | | | 3/12/2007 | | DONE |
|
|
|
call to gereald ebeling, permit ready to p/u, $150
|
Issue and Print Permit | | | 3/12/2007 | | |
|
|
|
|
Sprinkler Plan Check | 3/9/2007 | | 3/9/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/9/2007 | | DONE |
|
|
|
|
Application received | | | 3/8/2007 | | |
|
|
|
|