INSP-Final Inspection | 8/6/2008 | 8/8/2008 | 8/8/2008 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 8/5/2008 | 8/6/2008 | 8/6/2008 | P | CANC |
Troy Cobbley
|
|
|
Per Jim Danes the replacement sprinkler canopies are on order. The inspection will be called in at a later time.
|
INSP-Final Inspection | 8/5/2008 | 8/5/2008 | 8/5/2008 | P | FAIL |
Troy Cobbley
|
|
|
Need verification that the canopies have been factory painted. All other items are ok.
|
INSP-Final Inspection | 8/4/2008 | 8/5/2008 | 8/5/2008 | A | FAIL |
Troy Cobbley
|
|
|
Need verification that the canopies have been factory painted. All other items are ok.
|
INSP-Sprinkler Rough-in/Hydro | 6/19/2008 | 6/20/2008 | 6/20/2008 | A | PASS |
Troy Cobbley
|
|
|
Above ground hydro test passed.
|
INSP-Sprinkler Rough-in/Hydro | 5/21/2008 | 5/22/2008 | 5/22/2008 | P | PASS |
Troy Cobbley
|
|
|
Underground hydro test passed
|
INSP-Sprinkler Rough-in | 4/30/2008 | 5/1/2008 | 5/1/2008 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. Simplex to provide as-builts.
|
Issue permit | | | 3/5/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/20/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/20/2008 | | 2/20/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 2/20/2008 | | DONE |
|
|
|
lft vm with jim danes ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 2/20/2008 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in | 2/15/2008 | 2/19/2008 | 2/19/2008 | A | PASS |
Troy Cobbley
|
|
|
The underground supply piping for building "A" is ok for cover
|
Sprinkler Plan Check | 2/7/2008 | | 2/18/2008 | | PASS |
|
|
|
This was a plan modification of which 10 heads and 4 sets of calculations were affected.
|
Plan resubmittals received | | | 2/7/2008 | | |
|
|
|
received 1 Fire Sprinkler Permit Application, 5 copies of sheets FP1 OF 3,FP2 OF 3, FP3 OF 3 AND 5 CALC BOOKS sent to fire
|
INSP-Sprinkler Rough-in/Hydro | 2/5/2008 | 2/6/2008 | 2/6/2008 | A | PASS |
Troy Cobbley
|
|
|
The sprinkler piping is ok to cover. Contractor provided Brian Johnson revised hydraulic calculations. The fire sprinkler contractor still needs to provide resubmittals for all of the changes that have occured prior to a final inspection for this project.
|
Issue and Print Permit | | | 1/25/2008 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/30/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/26/2007 | | 3/26/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/8/2007 | | 3/23/2007 | | PASS |
|
|
|
Plans are approved w/conditions by Bryan Johnson (Permit will not be released intil BLD06-01170 has been picked up and paid for)
|
Case Summary | | | 3/8/2007 | | DONE |
|
|
|
|
Application received | | | 3/8/2007 | | |
|
|
|
|
Pending Assignment by SAM | 3/8/2007 | | | | |
|
|
|
|