INSP-Final Inspection | 5/23/2007 | 5/24/2007 | 5/24/2007 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 5/23/2007 | 5/23/2007 | 5/23/2007 | A | PASS |
Forrest France
|
|
|
Required correction verified, fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 5/16/2007 | 5/17/2007 | 5/17/2007 | A | PART |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover but one additional pendant is needed on the second floor against the east wall. This will be verified at the final.
|
Issue and Print Permit | | | 3/30/2007 | | DONE |
|
|
|
|
Telephone call | | | 3/29/2007 | | DONE |
|
|
|
telcon from Jim, DeBest and follow up on status of issuing permit.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/29/2007 | | |
|
|
|
|
Inspection Record Card- Fire | 3/29/2007 | | 3/29/2007 | | DONE |
|
|
|
|
Telephone call | | | 3/29/2007 | | DONE |
|
|
|
tlk to secretary ###-#### debest that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 3/29/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/14/2007 | | 3/26/2007 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Application received | | | 3/14/2007 | | |
|
|
|
|
Pending Assignment by SAM | 3/14/2007 | | | | |
|
|
|
|