Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberFIR07-00234
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 1463 W GRAND ST
Project NameGRAND AVE HOMES BLDG #2
Customer Number 
ePlanReview 
Description
Revised Scope of Work
To install a fire life safety NFPA 13R system to prevent flashover (total involvement) in the room of fire origin, where sprinklered, and to improve the chance for occupants to escape or be evacuated, in a new 9,316-ft/2 three story, apartment building. An NFPA 13R fire sprinkler protection system is required. The system shall be equipped with separate systems and controls for each unit and an alarm initiating device connected to an alarm system and an outside annunciating devise. All fire sprinkler work and related, which includes dual service underground water supply, the system backflow prevention device (provided by others), shall be per NFPA 13R, approved plans, engineering/red-lining and attached review comments, under direction of the Fire Chief. This permit is attached to: BLD06-00075.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/21/20082/22/20082/22/2008PPASS
DetailsForrest France
All corrections were made per last inspection. KR
INSP-Supply line flush2/20/20082/21/20082/21/2008AFAIL
DetailsForrest France
See city approved plans with red lined notes.
Back flow need cert,missing sprinkler head in ac, water heater closet on south west corner of building. Some heads covered with tape. see red lined notes for locations. KR
INSP-Sprinkler Rough-in11/26/200711/27/200711/27/2007APART
DetailsForrest France
Underground flush passed as per KR
INSP-Sprinkler Rough-in/Hydro11/16/200711/20/200711/20/2007APART
DetailsForrest France
UG fire supply line hydrostatic test passed.
INSP-Sprinkler Rough-in8/30/20078/31/20078/31/2007APART
DetailsForrest France
DSW heads at building #2 second and third floors are approved for cover, discussed schedule for bld #3.
INSP-Sprinkler Rough-in8/29/20078/30/20078/30/2007ACANC
DetailsForrest France
Overbooked
Issue and Print Permit  8/29/2007 DONE
Plan assigned to (SAM)8/6/2007 8/28/2007 PASS
8/28/2007 12:14:45 P_S - activity updated through activity FIRA22 from case FIR07-00234.
Case Summary  8/28/2007  
Sprinkler Plan Check6/21/2007 8/28/2007 DONE
plans are approve w/ attached comments as submitted by bryan johnson
Inspection Record Card- Fire8/28/2007 8/28/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/28/2007 DONE
Telephone call  8/28/2007 DONE
t/c w clarence calkins at ###-#### - permit ready and fees given
Permit Ready to Issue  8/28/2007 DONE
Plan resubmittals received  8/6/2007  
Received five binders with applications and pages FP1, FP2; taken to fire review
INSP-Sprinkler Rough-in/Hydro7/9/20077/10/20077/10/2007AFAIL
DetailsForrest France
Per requirements of IFC 2003 903.3.1.2.1 sprinkler protection shall be provided for exterior balconies and ground floor patios of dwelling units protected by a 13R system. The overhead hydrostatic testing for building 2 completed satisfactory.
INSP-Sprinkler Rough-in/Hydro7/6/20077/9/20077/10/2007PFAIL
DetailsForrest France
Some items noted at the previous inspection have been completed, various hangers are not correctly installed according to the listing, missing hangers at some locations.
INSP-Sprinkler Rough-in/Hydro7/3/20077/5/20077/5/2007PFAIL
DetailsForrest France
OH rough-in is not approved for cover until system piping is correctly attatched to the structure as required, missing hangers and upward restraint at several locations, noted some heads have been added and piping relocated from approved plan set, OH hydro test not ready at this time due to pressure loss, tenting appears adequate.
INSP-Sprinkler Rough-in/Hydro6/29/20077/2/20077/2/2007PCANC
DetailsForrest France
Please call 1/2 hr prior to inspection. Brian F. is the contact. Thanks Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
Plan resubmittals received  6/29/2007  
These are not resubmittals. These submittals should have been created as new permit Fir07-00603.
Case Summary  6/29/2007  
Issue and Print Permit  6/25/2007 DONE
(F) Reprint permit  6/25/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/22/2007 DONE
Inspection Record Card- Fire6/22/2007 6/22/2007 DONE
Telephone call  6/22/2007 DONE
tlk to lillie scales ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  6/22/2007 DONE
Sprinkler Plan Check6/14/2007 6/21/2007 PASS
Plans are approved w/attached comments by Bryan Johnson
Plan resubmittals received  6/14/2007  
Received 5 copies of app, water flow info, hydraulic calcs, product data, drawings on pages FP1, FP2; taken to fire review
Plan resubmittals received  5/21/2007  
Received 5 copies of application, resonse letter, copy of Boise City Plan Review, water flow info, hydraulic calcs, product data, and shop drawings on page 1; taken to fire review
Plan resubmittals received  5/1/2007  
Received five copies of the following: fire sprinkler application, letter to Bryan Johnson, Copy of Fire Plan Review, product data, water flow info, hydraulic calculations, shop drawings, page FP1; taken to fire plan review
Application received  3/15/2007  
Pending Assignment by SAM3/15/2007