INSP-Final Inspection | 3/14/2008 | 3/17/2008 | 3/17/2008 | A | PASS |
Forrest France
|
|
|
Noted corrections verified for completion, fire sprinkler permit finaled.
|
INSP-Final Inspection | 3/13/2008 | 3/14/2008 | 3/17/2008 | A | PASS |
Forrest France
|
|
|
Noted corrections verified for completion, fire sprinkler permit finaled.
|
INSP-Final Inspection | 3/12/2008 | 3/13/2008 | 3/13/2008 | A | FAIL |
Forrest France
|
|
|
The leak at the riser supply piping has not been repaired, discovered an additional leak at a closet sprinkler head in one apartment unit, travel cap at one ssu in a mechanical closet has not been removed, one defective pendent at a stairway needs replaced, missing escutcheon at one DSW, noted two additional painted heads in need of replacement including a DSW and one pendent at a stairway. Recommend contractor to perform a complete walkthrough of the project prior to scheduling a final inspection. Re-inspection fees will apply to the next field visit for project final.
|
INSP-Final Inspection | 3/10/2008 | 3/10/2008 | 3/11/2008 | P | FAIL |
Forrest France
|
|
|
PIV tamper switch is out of adjustment, missing orfice at inspectors test, noted leakage at the riser to be repaired, need signage at the risers indicating location of system served, missing "911" sign at the bell, permit work is not complete for final at this time.
|
INSP-Sprinkler Rough-in | 11/26/2007 | 11/27/2007 | 11/27/2007 | A | PART |
Forrest France
|
|
|
UG fire supply line flush completed okay.
|
INSP-Sprinkler Rough-in/Hydro | 11/16/2007 | 11/20/2007 | 11/20/2007 | P | PART |
Forrest France
|
|
|
UG fire supply line hydrostatic test passed.
|
INSP-Sprinkler Rough-in/Hydro | 10/16/2007 | 10/17/2007 | 10/18/2007 | A | PASS |
Troy Cobbley
|
|
|
Above ground hydro on Bldg 3 passed
|
INSP-Sprinkler Rough-in | 10/1/2007 | 10/3/2007 | 10/3/2007 | P | PART |
Forrest France
|
|
|
Corrections for the overhead install are complete, tenting has been repaired, noted some heads are in close proximity to electrical junction boxes-be aware of possible fixture obstructions.
|
INSP-Sprinkler Rough-in/Hydro | 10/3/2007 | 10/3/2007 | 10/3/2007 | P | NR |
Forrest France
|
|
|
Hydro needed, Brian F is the contact. Thank you. Phone #: ###-#### Internet Inspection Request from: Stan Beus Hydrostatic test is not ready per conversation with the fitter.
|
INSP-Sprinkler Rough-in | 9/26/2007 | 9/27/2007 | 9/27/2007 | A | PART |
Forrest France
|
|
|
Still missing tenting at the 3rd floor east apt., one head is still overspaced at the 2nd floor east unit, remainder of corrections have been completed as noted on plans, OH hydro was not ready for inspection.
|
INSP-Sprinkler Rough-in/Hydro | 9/21/2007 | 9/24/2007 | 9/24/2007 | P | NR |
Forrest France
|
|
|
Contractor is not ready for hydrostatic testing.
|
INSP-Sprinkler Rough-in/Hydro | 9/20/2007 | 9/21/2007 | 9/21/2007 | A | FAIL |
Forrest France
|
|
|
Some items remian to be completed on the rough-in correction notice, overhead hydro is not ready for inspection.
|
INSP-Sprinkler Rough-in/Hydro | 9/12/2007 | 9/13/2007 | 9/13/2007 | P | FAIL |
Forrest France
|
|
|
See approved plans for locations in need of corrections including missing head at the 2nd floor system 2, overspaced head off an adjacent wall 2nd floor syst. 2, tenting at the 3rd floor is NOT adequate, hydro test failed, some DSW have been deleted, the riser and adjacent mech. room are not complete, NOTE: the 2nd floor system 1feed is not connected or has been moved and could not be located-need to verify connection point. Installation is not approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 9/10/2007 | 9/12/2007 | 9/13/2007 | A | FAIL |
Forrest France
|
|
|
Hydrostatic test failed due to pressures below 200psi at the guage.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/7/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/7/2007 | | 9/7/2007 | | DONE |
|
|
|
|
Telephone call | | | 9/7/2007 | | DONE |
|
|
|
tlk to lilly ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 9/7/2007 | | |
|
|
|
|
(F) Reprint permit | | | 9/7/2007 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/7/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/21/2007 | | 8/30/2007 | | PASS |
|
|
|
Plans are approved w/attached comments per Bryan Johson
|
Plan resubmittals received | | | 8/21/2007 | | |
|
|
|
|
Pending Assignment by SAM | 8/21/2007 | | 8/21/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 6/25/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/22/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/22/2007 | | 6/22/2007 | | DONE |
|
|
|
|
Telephone call | | | 6/22/2007 | | DONE |
|
|
|
tlk to lillie scales ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 6/22/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 6/14/2007 | | 6/20/2007 | | PASS |
|
|
|
Plans are approved w/attached comments by Bryan Johnson
|
Plan resubmittals received | | | 6/14/2007 | | |
|
|
|
Received 5 copies of app, water flow info, hydraulic calcs, product data, drawings on pages FP1, FP2; taken to fire review
|
Plan resubmittals received | | | 5/21/2007 | | |
|
|
|
Received 5 copies of application, resonse letter, copy of Boise City Plan Review, water flow info, hydraulic calcs, product data, and shop drawings on page 1; taken to fire review
|
Plan resubmittals received | | | 5/1/2007 | | |
|
|
|
Received five copies of the following: fire sprinkler application, letter to Bryan Johnson, Copy of Fire Plan Review, product data, water flow info, hydraulic calculations, shop drawings, page FP1; taken to fire plan review
|
Application received | | | 3/15/2007 | | |
|
|
|
|
Pending Assignment by SAM | 3/15/2007 | | | | |
|
|
|
|