INSP-Final Inspection | 4/16/2007 | 4/16/2007 | 4/16/2007 | P | PASS |
Forrest France
|
|
|
Fire sprinkler work passed final inspection.
|
INSP-Sprinkler Rough-in/Hydro | 4/9/2007 | 4/9/2007 | 4/9/2007 | P | PART |
Forrest France
|
|
|
Fire sprinkler install is approved for cover as noted.
|
INSP-Sprinkler Rough-in/Hydro | 4/6/2007 | 4/9/2007 | 4/9/2007 | A | FAIL |
Forrest France
|
|
|
The modifications and installation must remain exposed for inspection prior to cover, need to remove ceiling tiles at affected areas, also need to provide approved plans on site as required.
|
Telephone call | | | 4/6/2007 | | DONE |
|
|
|
tlk to tom dutkus ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 4/6/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 4/6/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/6/2007 | | 4/6/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/20/2007 | | 4/5/2007 | | PASS |
|
|
|
Plans are approved as Submitted by Bryan Johnson
|
Application received | | | 3/20/2007 | | |
|
|
|
|
Case Summary | | | 3/20/2007 | | |
|
|
|
|
Pending Assignment by SAM | 3/20/2007 | | | | |
|
|
|
|