INSP-Final Inspection | 5/2/2007 | 5/2/2007 | 5/2/2007 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 5/1/2007 | 5/1/2007 | 5/2/2007 | P | PASS |
Forrest France
|
|
|
Fire sprinkler system modifications passed inspection.
|
Issue and Print Permit | | | 4/9/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/6/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/6/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/6/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/6/2007 | | 4/6/2007 | | DONE |
|
|
|
|
Telephone call | | | 4/6/2007 | | DONE |
|
|
|
lft vm with brad bettencourt ###-#### that permit and fees are ready to be picked up
|
Sprinkler Plan Check | 3/21/2007 | | 4/5/2007 | | PASS |
|
|
|
*Plans are approved by bryan Johnson
|
Application received | | | 3/21/2007 | | |
|
|
|
|