INSP-Final Inspection | 10/16/2007 | 10/18/2007 | 10/18/2007 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/17/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/17/2007 | | 10/17/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/17/2007 | | DONE |
|
|
|
|
Telephone call | | | 10/17/2007 | | DONE |
|
|
|
lft vm with lilly ###-#### that permit and fees are ready to be picked up
|
(F) Reprint permit | | | 10/17/2007 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/17/2007 | | DONE |
|
|
|
|
INSP-Final Inspection | 10/12/2007 | 10/15/2007 | 10/15/2007 | P | FAIL |
Forrest France
|
|
|
Provide forward flow bypass as indicated on approved plans, preaction pressure switch is not connected to the outside bell, need 911 sign at bell, provide lockout for the switches to the air compressor, need to certify the DCVA and the RP, provide calc. stickers, tags, signage etc. at the riser, need signage and locks for the control valves at the antifreeze loop, provide as-builts for field changes, need final walkthrough completed.
|
Sprinkler Plan Check | 10/8/2007 | | 10/15/2007 | | PASS |
|
|
|
Plans are approved with conditions by Bryan Johnson
|
Plan resubmittals received | | | 10/8/2007 | | |
|
|
|
received "5" books & "5" sets of plans including FP1 of 2 & FP2 of 2--plans put on shelf for fire
|
INSP-Sprinkler Rough-in | 9/20/2007 | 9/21/2007 | 9/21/2007 | A | PART |
Forrest France
|
|
|
Noted correction items from the previous inspection are complete, OH rough-in is acceptable.
|
INSP-Sprinkler Rough-in | 9/10/2007 | 9/11/2007 | 9/11/2007 | P | FAIL |
Forrest France
|
|
|
See approved plans for areas in need of correction including overspacing at the data room, obstructed head at the second floor mech room, need to add one head in the riser room, blocked SW heads as noted, the antifreeze loop is not yet installed.
|
INSP-Sprinkler Rough-in/Hydro | 9/7/2007 | 9/10/2007 | 9/10/2007 | P | PART |
Forrest France
|
|
|
OH hydrostatic test for the wet system and the preaction system both passed, contractor also completed a satisfactory UG supply line hydro as well.
|
Plan assigned to (SAM) | 8/3/2007 | | 8/21/2007 | | PASS |
|
|
|
8/21/2007 12:27:04 CMC - activity updated through activity FIRA22 from case FIR07-00285.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/21/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/21/2007 | | 8/21/2007 | | DONE |
|
|
|
|
Telephone call | | | 8/21/2007 | | |
|
|
|
tlk to lilly ###-#### that permit and no fee ready to be picked up
|
Permit Ready to Issue | | | 8/21/2007 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/21/2007 | | |
|
|
|
already issued
|
Sprinkler Plan Check | 8/2/2007 | | 8/17/2007 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Plan resubmittals received | | | 8/2/2007 | | |
|
|
|
Received five binders with applications and submittal info, and five copies of plan pages FP1, FP2; taken to fire review
|
INSP-Sprinkler Rough-in | 7/20/2007 | 7/23/2007 | 7/23/2007 | A | FAIL |
Forrest France
|
|
|
Inspection for the 1st floor hard lid ceilings only, pendent head at the NW entry does not meet requirements of NFPA 13 table 8.6.5.1.2, heads at the restrooms and the elevator equip. room are okay for cover.
|
INSP-Supply line flush | 7/13/2007 | 7/16/2007 | 7/16/2007 | A | PART |
Forrest France
|
|
|
UG fire supply line flush completed satisfactory, circled on approved plans areas okay for cover on the 2nd floor, discussed coverage below stairs at the NW entry.
|
INSP-Sprinkler Rough-in | 7/11/2007 | 7/12/2007 | 7/12/2007 | A | PART |
Forrest France
|
|
|
Heads and piping at the 2nd floor stairway and restroom hard lid ceilings appears satisfactory, however no approved plans were made available on site for verification.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/26/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/26/2007 | | 6/26/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/26/2007 | | 6/26/2007 | | DONE |
|
|
|
|
Telephone call | | | 6/26/2007 | | DONE |
|
|
|
tlk to lilly that her permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 6/26/2007 | | |
|
|
|
|
Issue and Print Permit | | | 6/26/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 6/15/2007 | | 6/25/2007 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Plan resubmittals received | | | 6/15/2007 | | |
|
|
|
re-submittals received - 5 fire sprinkler shop drawings , 5 calcs and data sent to fire/Scott A.
|
Plan resubmittals received | | | 6/1/2007 | | |
|
|
|
|
Plan resubmittals received | | | 4/30/2007 | | |
|
|
|
|
Telephone call | | | 4/17/2007 | | |
|
|
|
tlk to lily to let her know the quick permit has been denied
|
Plan resubmittals received | | | 4/12/2007 | | |
|
|
|
|
Case Summary | | | 4/2/2007 | | DONE |
|
|
|
|
Application received | | | 4/2/2007 | | |
|
|
|
|
Pending Assignment by SAM | 4/2/2007 | | | | |
|
|
|
|
Inspection Record Card- Fire | 8/21/2007 | | | | |
|
|
|
|