INSP-Final Inspection | 11/14/2007 | 11/15/2007 | 11/15/2007 | A | PASS |
Forrest France
|
|
|
Corrections verified for completion, fire sprinkler permit finaled.
|
INSP-Final Inspection | 10/26/2007 | 10/30/2007 | 10/30/2007 | A | FAIL |
Forrest France
|
|
|
Pendent heads adjacent to the east roll up door exceed noted system design spacing of 100ft2 max.
|
INSP-Sprinkler Rough-in | 9/4/2007 | 9/5/2007 | 9/5/2007 | A | PART |
Forrest France
|
|
|
Fire sprinkler system modificaitons are approved for cover at the remodel area.
|
Plan resubmittals received | | | 9/5/2007 | | PASS |
|
|
|
revised plan sheets FP0.0. and FP2.1.1; approved 8/28/07 on site by T.Cobbley
|
INSP-Sprinkler Rough-in | 9/4/2007 | 9/4/2007 | 9/4/2007 | P | DEFR |
Forrest France
|
|
|
Inspection rescheduled for 9/5 as discussed.
|
INSP-Sprinkler Rough-in | 8/29/2007 | 8/30/2007 | 8/30/2007 | P | CANC |
Forrest France
|
|
|
Overbooked
|
Issue and Print Permit | | | 5/14/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/11/2007 | | DONE |
|
|
|
|
Plan assigned to (Scott) | | | 4/5/2007 | | DONE |
Bill Alexander
|
|
|
This permit was created on the web by Paul Marcolina
|
Application received | | | 4/5/2007 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|
Sprinkler Plan Check | 4/5/2007 | | 4/5/2007 | | PASS |
|
|
|
Reviewed/approved onsite by T. Cobbley 4/5/07
|