Miscellaneous action | | | 3/10/2009 | | DONE |
|
|
|
Sent for archiving
|
INSP-Final Inspection | 10/27/2008 | 10/27/2008 | 10/27/2008 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 6/25/2008 | 6/25/2008 | 6/25/2008 | P | DONE |
Forrest France
|
|
|
Ok to cover, Sprinkler head moved per Troys notes. KR
|
INSP-Sprinkler Rough-in/Hydro | 6/9/2008 | 6/10/2008 | 6/10/2008 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed except a pendant head in the upper floor restroom is blocked by a stub wall. Will need a separate inspection when the tenting is done. Nick Anderson provided revised hydraulic calculations for the side wall head in the lower level bedroom #2 proving it could be spaced in the 6" top 12" window.
|
FIR-Aging Inspection | 8/22/2007 | 8/22/2007 | 8/24/2007 | | NR |
Troy Cobbley
|
|
|
work is on hold per tom
|
Issue and Print Permit | | | 4/25/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/20/2007 | | DONE |
|
|
|
|
Telephone call | | | 4/20/2007 | | DONE |
|
|
|
tlk to tom dutkus ###-#### that permit and fees are ready to be picked up
|
Inspection Record Card- Fire | 4/20/2007 | | 4/20/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/20/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 4/6/2007 | | 4/18/2007 | | PASS |
|
|
|
Plans are approved with Conditions by Bryan Johnson
|
Case Summary | | | 4/6/2007 | | DONE |
|
|
|
|
Application received | | | 4/6/2007 | | |
|
|
|
|
Pending Assignment by SAM | 4/6/2007 | | | | |
|
|
|
|