INSP-Final Inspection | 7/12/2007 | 7/13/2007 | 7/13/2007 | A | PASS |
Forrest France
|
|
|
Final fire sprinkler field inspection passed, noted main drain connection to be piped outside or to an area that will not cause water damage when operated, contractor to have BFP certified today per agreement.
|
INSP-Supply line flush | 7/12/2007 | 7/13/2007 | 7/13/2007 | A | PART |
Forrest France
|
|
|
UG supply line flush completed satisfactory.
|
INSP-Sprinkler Rough-in | 5/10/2007 | 5/11/2007 | 5/11/2007 | A | PART |
Forrest France
|
|
|
Need to inspect the utility/riser room for tenting and insulation prior to cover, the remainder of the house is okay for cover.
|
INSP-Sprinkler Rough-in | 5/1/2007 | 5/2/2007 | 5/2/2007 | A | PART |
Forrest France
|
|
|
OH install is satisfactory, noted approval for cover pending inspection for cold cavity protection (tenting) as discussed with contractor.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/24/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/24/2007 | | 4/24/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/24/2007 | | DONE |
|
|
|
|
Telephone call | | | 4/24/2007 | | DONE |
|
|
|
tlk to greg johnson ###-#### that permit and fees are ready to be picked up
|
Issue and Print Permit | | | 4/24/2007 | | |
|
|
|
|
Sprinkler Plan Check | 4/9/2007 | | 4/19/2007 | | PASS |
|
|
|
Plans are approved with conditions by Bryan Johnson
|
Application received | | | 4/9/2007 | | |
|
|
|
|
Case Summary | | | 4/9/2007 | | DONE |
|
|
|
|
Case Summary | | | 4/9/2007 | | DONE |
|
|
|
|
Pending Assignment by SAM | 4/9/2007 | | | | |
|
|
|
|