INSP-Final Inspection | 4/30/2007 | 4/30/2007 | 4/30/2007 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 4/25/2007 | 4/26/2007 | 4/26/2007 | A | PASS |
Troy Cobbley
|
|
|
Need paper taken off of two uprights along the exterior wall, need the annual inspection for the sprinkler system done and it appears the riser room has no sprinkler protection. I contacted jim danes about the items. Sprinkler piping is ok to cover.
|
Override - People Holds | | | 4/20/2007 | | |
|
|
|
|
Permit Ready to Issue | | | 4/20/2007 | | DONE |
|
|
|
|
Override - People Holds | | | 4/20/2007 | | |
|
|
|
|
Inspection Record Card- Fire | 4/20/2007 | | 4/20/2007 | | DONE |
|
|
|
|
Telephone call | | | 4/20/2007 | | DONE |
|
|
|
call to jim danes, permit ready to pu and fee is $ 150
|
Override - People Holds | | | 4/20/2007 | | |
|
|
|
|
Issue permit | | | 4/20/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 4/19/2007 | | 4/19/2007 | | PASS |
|
|
|
Plans reviewed by Johnson Consulting.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/19/2007 | | DONE |
|
|
|
|
Application received | | | 4/10/2007 | | |
|
|
|
|
Pending Assignment by SAM | 4/10/2007 | | | | |
|
|
|
|