INSP-Final Inspection | 10/16/2007 | 10/17/2007 | 10/17/2007 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 10/1/2007 | 10/4/2007 | 10/5/2007 | P | CANC |
Forrest France
|
|
|
bill Phone #: ###-#### Incorrect permit number called in, was intended for the project related fire alarm permit.
|
INSP-Sprinkler Rough-in/Hydro | 9/19/2007 | 9/20/2007 | 9/20/2007 | A | PASS |
Forrest France
|
|
|
UG fire supply line passed hydrostatic testing.
|
INSP-Sprinkler Rough-in/Hydro | 9/14/2007 | 9/14/2007 | 9/14/2007 | P | FAIL |
Forrest France
|
|
|
UG fire supply line hydro failed due to pressure loss at the guage.
|
INSP-Sprinkler Rough-in/Hydro | 9/12/2007 | 9/13/2007 | 9/13/2007 | A | FAIL |
Forrest France
|
|
|
UG lost 15 psi. at the guage.
|
INSP-Supply line flush | 8/15/2007 | 8/15/2007 | 8/15/2007 | P | PART |
Forrest France
|
|
|
UG fire supply line flush completed satisfactory.
|
INSP-Sprinkler Rough-in/Hydro | 8/10/2007 | 8/13/2007 | 8/13/2007 | A | FAIL |
Forrest France
|
|
|
UG hydrostatic test failed due to pressure drop below 200 psi, guage appears damaged and may need to be replaced for accurate readings.
|
INSP-Sprinkler Rough-in/Hydro | 8/9/2007 | 8/10/2007 | 8/10/2007 | A | FAIL |
Forrest France
|
|
|
UG fire supply line hydrostatic test failed due to 15psi. pressure loss at the guage.
|
Case Summary | | | 7/26/2007 | | |
|
|
|
|
INSP-Sprinkler Rough-in | 6/26/2007 | 6/27/2007 | 6/27/2007 | A | CANC |
Forrest France
|
|
|
Per phone call from contractor, UG inspection canceled.
|
INSP-Sprinkler Rough-in | 6/20/2007 | 6/20/2007 | 6/21/2007 | P | NR |
Forrest France
|
|
|
Work is not ready for inspection.
|
Issue and Print Permit | | | 5/15/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/19/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/19/2007 | | 4/19/2007 | | DONE |
|
|
|
|
Telephone call | | | 4/19/2007 | | |
|
|
|
tlk to brook ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 4/19/2007 | | |
|
|
|
|
Sprinkler Plan Check | 4/10/2007 | | 4/18/2007 | | PASS |
|
|
|
Plans are approved w/attached Comments by Bryan Johnson
|
Case Summary | | | 4/10/2007 | | DONE |
|
|
|
|
Application received | | | 4/10/2007 | | |
|
|
|
|
Pending Assignment by SAM | 4/10/2007 | | | | |
|
|
|
|