INSP-Final Inspection | 10/4/2007 | 10/4/2007 | 10/4/2007 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 10/2/2007 | 10/3/2007 | 10/4/2007 | P | PASS |
Forrest France
|
|
|
The remainder of seismic upgrade work has been completed, inspection passed.
|
INSP-Sprinkler Rough-in/Hydro | 9/28/2007 | 10/2/2007 | 10/2/2007 | A | PART |
Forrest France
|
|
|
See annotations on plan for areas approved related to the seismic upgrade, mechanical and boiler room areas not inspected at this time.
|
INSP-Sprinkler Rough-in/Hydro | 9/21/2007 | 9/24/2007 | 9/24/2007 | A | PART |
Forrest France
|
|
|
Seismic upgrade work for the basement level west half as noted on plans is acceptable, no access to the ceiling above the locker room at this time, noted one location not completed, verified main is connected for the new computer and storage room heads.
|
INSP-Sprinkler Rough-in/Hydro | 9/13/2007 | 9/14/2007 | 9/14/2007 | A | PART |
Forrest France
|
|
|
OH install as circled and initialed on the approved plan set for the office storage and computer room areas is approved for cover, need to verify connection to the existing main when complete, hydrostatic test for this area passed although not required per NFPA as the modification is less than 20 heads.
|
Issue and Print Permit | | | 9/7/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/6/2007 | | |
|
|
|
|
Telephone call | | | 9/6/2007 | | DONE |
|
|
|
tlk to tom housholder ###-#### that permit and no fees but talked him about the previous boise cascade fees and transferred to Sam rogers
|
Inspection Record Card- Fire | 9/6/2007 | | 9/6/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/6/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/20/2007 | | 8/30/2007 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Plan resubmittals received | | | 8/20/2007 | | |
|
|
|
|
Issue and Print Permit | | | 5/4/2007 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/3/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/3/2007 | | 5/3/2007 | | DONE |
|
|
|
|
Telephone call | | | 5/3/2007 | | DONE |
|
|
|
lft vm with tom housholder ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 5/3/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 4/13/2007 | | 5/2/2007 | | PASS |
|
|
|
Basement Upgrade Plans are approved 05/02/07
|
Application received | | | 4/13/2007 | | |
|
|
|
|
Pending Assignment by SAM | 4/13/2007 | | | | |
|
|
|
|