Permit EXPIRED | | | 3/15/2010 | | DONE |
|
|
|
This work was completed by Idaho Fire Protection under permit FIR09-00197
|
Miscellaneous action | | | 3/10/2010 | | DONE |
|
|
|
Sent email requesting project status.
|
Case Summary | | | 3/11/2008 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in | 6/5/2007 | 6/6/2007 | 6/6/2007 | A | PASS |
Troy Cobbley
|
|
|
Previous inspection gave ok to cover.
|
INSP-Sprinkler Rough-in/Hydro | 5/22/2007 | 5/24/2007 | 5/24/2007 | A | PART |
Forrest France
|
|
|
FS approved for cover at the hard lid ceilings.
|
Issue and Print Permit | | | 4/19/2007 | | |
|
|
|
|
Inspection Record Card- Fire | 4/18/2007 | | 4/18/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/18/2007 | | DONE |
|
|
|
|
Telephone call | | | 4/18/2007 | | DONE |
|
|
|
call to gereald at debest, permit ready to p/u fee $150.00
|
Inspection Record Card- Fire | 4/18/2007 | | 4/18/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 4/16/2007 | | 4/17/2007 | | PASS |
|
|
|
Pending sprinkler head orifice confirmation by fire sprinkler designer. 4/17/07 - Designer confirmed that orifice sizes of sprinkler heads are 17/32 inch as noted in red on plan.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/17/2007 | | DONE |
|
|
|
|
Telephone call | | | 4/16/2007 | | DONE |
|
|
|
Spoke with Gerald Ebeling of Debest Fire Protection regarding the orifice size of sprinkler to be installed. Sprinkler data sheet indicates 3/4" and plans indicate 7/16". Requested confirmation from Debest as to which orifice size is accurate.
|
Application received | | | 4/16/2007 | | |
|
|
|
|