INSP-Final Inspection | 10/23/2007 | 10/24/2007 | 10/24/2007 | P | PASS |
Forrest France
|
|
|
Final fire sprinkler inspection passed, permit finaled.
|
INSP-Sprinkler Rough-in | 9/7/2007 | 9/7/2007 | 9/7/2007 | P | PART |
Forrest France
|
|
|
DP rough-in at the entry vestibule, head relocation and head change for the lobby including suite 110 are satisfactory, also inspected temp. ssu protection at suite 130, no access provided for the remainder of the building to verify head replacement completion.
|
(F) Reprint permit | | | 8/24/2007 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/24/2007 | | DONE |
|
|
|
|
Plan resubmittals received | | | 8/23/2007 | | DONE |
|
|
|
|
Miscellaneous action | | | 8/23/2007 | | PASS |
|
|
|
Plan modification recieved although no floor plan was provided. Faxed larren Bailey to request submittal of floor plan to show area of plan modifications.*Reissue permit, no addtional fee required
|
Plan resubmittals received | | | 8/23/2007 | | DONE |
|
|
|
Floor plan recieved from Larren Bailey.
|
Sprinkler Plan Check | 8/23/2007 | | 8/23/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/23/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/23/2007 | | 8/23/2007 | | DONE |
|
|
|
|
Telephone call | | | 8/23/2007 | | DONE |
|
|
|
t/c w larren bailey at ###-#### - permit ready to be picked up - no fees
|
Permit Ready to Issue | | | 8/23/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 4/25/2007 | | |
|
|
|
|
Sprinkler Plan Check | 4/20/2007 | | 4/20/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/20/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/20/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/20/2007 | | 4/20/2007 | | DONE |
|
|
|
|
Telephone call | | | 4/20/2007 | | DONE |
|
|
|
call to ron larson, permit ready to p/u and fee is $1,428.84
|
Application received | | | 4/19/2007 | | |
|
|
|
|
Pending Assignment by SAM | 4/19/2007 | | | | |
|
|
|
|