INSP-Final Inspection | 6/1/2007 | 6/4/2007 | 6/4/2007 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 5/24/2007 | 5/25/2007 | 5/25/2007 | A | FAIL |
Forrest France
|
|
|
Heads in sales office 106 are overspaced.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/14/2007 | | DONE |
|
|
|
|
Telephone call | | | 5/14/2007 | | DONE |
|
|
|
tlk to absolute fire protection ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 5/14/2007 | | DONE |
|
|
|
|
Issue permit | | | 5/14/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/11/2007 | | 5/11/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 5/9/2007 | | 5/10/2007 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Miscellaneous action | | | 5/9/2007 | | DONE |
|
|
|
Approved Early Start request from Abosulte Fire to install overhead piping and drops to the ceiling grid.
|
Case Summary | | | 4/19/2007 | | DONE |
|
|
|
|
Application received | | | 4/19/2007 | | |
|
|
|
|
Pending Assignment by SAM | 4/19/2007 | | | | |
|
|
|
|