Permit EXPIRED | | | 12/16/2011 | | DONE |
|
|
|
|
FIR-Aging Inspection | 10/25/2011 | 10/25/2011 | 10/25/2011 | | DONE |
Forrest France
|
|
|
Construction suspended.
|
FIR-Aging Inspection | 7/26/2011 | 7/26/2011 | 7/26/2011 | | DEFR |
Forrest France
|
|
|
Ref. activity notes.
|
FIR-Aging Inspection | 4/26/2011 | 4/26/2011 | 4/26/2011 | | DONE |
Forrest France
|
|
|
|
FIR-Aging Inspection | 2/21/2011 | 2/21/2011 | 2/23/2011 | | DONE |
Forrest France
|
|
|
Construction suspended.
|
FIR-Aging Inspection | 12/22/2010 | 12/22/2010 | 12/22/2010 | | DONE |
Forrest France
|
|
|
Construction suspended.
|
FIR-Aging Inspection | 10/22/2010 | 10/22/2010 | 10/27/2010 | | DONE |
Forrest France
|
|
|
No progress, construction suspended.
|
FIR-Aging Inspection | 8/18/2010 | 8/18/2010 | 8/19/2010 | | DONE |
Forrest France
|
|
|
Construction suspended.
|
FIR-Aging Inspection | 6/14/2010 | 6/14/2010 | 6/16/2010 | | DONE |
Forrest France
|
|
|
Site visit confirmed construction on this project has been suspended.
|
Miscellaneous action | | | 3/9/2010 | | DONE |
|
|
|
Sent email requesting project status.
|
INSP-Sprinkler Rough-in | 5/15/2007 | 5/16/2007 | 5/16/2007 | A | PART |
Forrest France
|
|
|
UG fire supply line is approved for cover, provide method for seismic clearance at the floor slab, need to verifiy which road box controls the east suply line as it was not apparent.
|
Issue and Print Permit | | | 5/15/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/14/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/14/2007 | | 5/14/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/14/2007 | | DONE |
|
|
|
|
Telephone call | | | 5/14/2007 | | DONE |
|
|
|
lft vm with randy bowran of debest ###-#### that permit and fees are ready to be picked up
|
Sprinkler Plan Check | 4/20/2007 | | 5/9/2007 | | PASS |
|
|
|
Approved w/conditions for fire sprinklers plan review-ug per Bryan Johnson
|
Application received | | | 4/20/2007 | | |
|
|
|
|
Pending Assignment by SAM | 4/20/2007 | | | | |
|
|
|
|