INSP-Final Inspection | 11/7/2007 | 11/7/2007 | 11/7/2007 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 11/6/2007 | 11/7/2007 | 11/7/2007 | P | PART |
Forrest France
|
|
|
Hydrostatic testing of the preaction system piping completed per K. Roule.
|
INSP-Sprinkler Rough-in/Hydro | 11/6/2007 | 11/6/2007 | 11/6/2007 | P | PART |
Forrest France
|
|
|
Pneumatic testing for the preaction system passed within allowable pressure loss of 1 1/2 psig.
|
INSP-Final Inspection | 11/1/2007 | 11/5/2007 | 11/5/2007 | P | PART |
Forrest France
|
|
|
Begin 24hr. pneumatic testing of the preaction system at 41psi.@11:40am.
|
INSP-Sprinkler Rough-in/Hydro | 11/1/2007 | 11/5/2007 | 11/5/2007 | P | PART |
Forrest France
|
|
|
Fire sprinkler rough-in completed acceptable.
|
Issue and Print Permit | | | 6/5/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/23/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/23/2007 | | 5/23/2007 | | DONE |
|
|
|
|
Telephone call | | | 5/23/2007 | | DONE |
|
|
|
tlk to tom easton ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 5/23/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 5/3/2007 | | 5/17/2007 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Case Summary | | | 5/3/2007 | | DONE |
|
|
|
|
Application received | | | 5/3/2007 | | |
|
|
|
|
Pending Assignment by SAM | 5/3/2007 | | | | |
|
|
|
|