INSP-Final Inspection | 9/24/2007 | 9/24/2007 | 9/24/2007 | P | PASS |
Forrest France
|
|
|
UG fire supply line permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 5/23/2007 | 5/24/2007 | 5/24/2007 | A | PART |
Forrest France
|
|
|
UG fire supply line is approved for bury to the point of connection at the property line.
|
INSP-Sprinkler Rough-in | 5/22/2007 | 5/23/2007 | 5/23/2007 | A | FAIL |
Forrest France
|
|
|
UG supply pipe could not be verified for proper installation due to trench collapse and excessive water over the pipe.
|
INSP-Sprinkler Rough-in | 5/22/2007 | 5/22/2007 | 5/22/2007 | P | NR |
Forrest France
|
|
|
Work is not yet completed for inspection.
|
INSP-Sprinkler Rough-in | 5/14/2007 | 5/15/2007 | 5/15/2007 | A | PART |
Troy Cobbley
|
|
|
The stub out 5' past the 90 is ok to bury.
|
Sprinkler Plan Check | 5/9/2007 | | 5/9/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/9/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/9/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/9/2007 | | 5/9/2007 | | DONE |
|
|
|
|
Telephone call | | | 5/9/2007 | | DONE |
|
|
|
call to mike oswald, permit ready to p/u and fee is $150
|
Issue and Print Permit | | | 5/9/2007 | | DONE |
|
|
|
|
Case Summary | | | 5/8/2007 | | DONE |
|
|
|
|
Application received | | | 5/8/2007 | | |
|
|
|
|
Pending Assignment by SAM | 5/8/2007 | | | | |
|
|
|
|