INSP-Final Inspection | 7/2/2008 | 7/7/2008 | 7/7/2008 | A | PASS |
Forrest France
|
|
|
Correction notice items verified for completion, fire sprinkler permit work finaled.
|
INSP-Sprinkler Rough-in | 3/19/2008 | 3/20/2008 | 3/20/2008 | A | PART |
Forrest France
|
|
|
OH work is approved for cover at the corridor and nurses station as marked on plans, noted one deleted head no longer required, one head at a janitors closet to be replaced due to deflector damage-see annotation on drawings.
|
INSP-Sprinkler Rough-in | 9/4/2007 | 9/4/2007 | 9/4/2007 | P | PART |
Forrest France
|
|
|
Circled areas on stamped plan set okayed for cover, noted one overspaced head at the corridor, remainder of the scope of work is not complete.
|
INSP-Sprinkler Rough-in | 8/28/2007 | 8/29/2007 | 8/29/2007 | A | CANC |
Troy Cobbley
|
|
|
Due to the abundance of inspections today there was not adequate time to perform this one. It will need to be rescheduled.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/25/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/25/2007 | | 5/25/2007 | | DONE |
|
|
|
|
Telephone call | | | 5/25/2007 | | DONE |
|
|
|
tlk to brodie ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 5/25/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/25/2007 | | 5/25/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 5/25/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 5/8/2007 | | 5/23/2007 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Application received | | | 5/8/2007 | | |
|
|
|
|
Pending Assignment by SAM | 5/8/2007 | | | | |
|
|
|
|