Permit Information
Permit NumberFIR07-00448
StatusFinaled
Name AMERICAN FIRE PROTECTION LLC
Site Address 211 W MAIN ST
Project Name 
Customer Number 
ePlanReview 
Description
Scope of Work: Underground & Overhead
Beginning from an existing 4” Ductile Iron & line off the West side of the bldg, run 158’ of 4” C-900 out and up into the riser room of the converted office bldg. A wet pipe sprinkler system will serve through out the bldg. including the attic. The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD06-00470.08/18/07 Revised Scope of Work:
These plans were resubmitted due to changes in the field which resulted in a complete new resubmittal of the plans and supporting calculations.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/13/200711/13/200711/13/2007PPASS
DetailsForrest France
Connection to fire alarm was complete.
INSP-Sprinkler Rough-in9/4/20079/5/20079/5/2007APART
DetailsForrest France
OH rough-in is approved for cover, noted items from the previous inspection have been completed.
INSP-Sprinkler Rough-in8/28/20078/28/20078/28/2007PFAIL
DetailsForrest France
Provide sprinkler coverage at the second floor dormer concealed space or fill entirely with insulation, provide matching temp. sprinkler heads under the stairs at the first floor, two uprights at the attic are blocked by insulation.
INSP-Sprinkler Rough-in8/23/20078/24/20078/24/2007PFAIL
DetailsForrest France
Insulation at the roof deck is still obstructing upright head coverage, also missing cold cavity protection at the concealed spaces above the riser and lobby.
INSP-Sprinkler Rough-in/Hydro8/20/20078/21/20078/21/2007PPART
DetailsForrest France
AG hydrostatic test passed, verified resubmitted plans on site, overhead is NOT approved for cover at this time due to upright head obstructions by insulation at the deck, also missing cold cavity protection for piping above the riser room and reception area.
PLANS/APPL TAKEN TO FRONT DESK  8/20/2007 DONE
Inspection Record Card- Fire8/20/2007 8/20/2007 DONE
Telephone call  8/20/2007 DONE
tlk to jim danes ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  8/20/2007 DONE
(F) Reprint permit  8/20/2007 DONE
CHANGE STATUS TO (ISS)  8/20/2007  
Sprinkler Plan Check8/3/2007 8/18/2007 PASS
Plans are approved by Bryan Johnson
Plan resubmittals received  8/3/2007  
INSP-Sprinkler Rough-in/Hydro7/18/20077/19/20077/19/2007PPART
DetailsTroy Cobbley
Underground hydro test passed but the overhead would not hold pressure.
INSP-Sprinkler Rough-in/Hydro7/17/20077/18/20077/18/2007AFAIL
DetailsTroy Cobbley
The overhead piping located on the second floor has numerous changes. These changes match the installation drawings but these drawings have no city approval. Resubmittals will be required showing the changes. All of these changes are in the remote area on the second floor. Insulation will need to be installed in the unsprinklered concealed spaces prior to cover approval as well.
INSP-Sprinkler Rough-in/Hydro7/17/20077/17/20077/17/2007PDEFR
DetailsForrest France
Scheduled 7/18
INSP-Supply line flush7/9/20077/10/20077/10/2007PPART
DetailsForrest France
UG fire supply line flush completed satisfactory, hydrostatic test not ready due to pressure loss at the guage.
INSP-Sprinkler Rough-in6/14/20076/15/20076/15/2007PPART
DetailsForrest France
UG fire supply line is approved for cover.
Issue and Print Permit  6/8/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/31/2007 DONE
Inspection Record Card- Fire5/31/2007 5/31/2007 DONE
Telephone call  5/31/2007 DONE
tlk to american fire protection that permit and fees are ready to be picked up
Permit Ready to Issue  5/31/2007 DONE
Inspection Record Card- Fire5/31/2007 5/31/2007 DONE
Sprinkler Plan Check5/15/2007 5/24/2007 PASS
Plans are approved by bryan Johnson
Case Summary  5/15/2007 DONE
Application received  5/15/2007  
Pending Assignment by SAM5/15/2007