INSP-Final Inspection | 8/27/2007 | 8/27/2007 | 8/28/2007 | P | PASS |
Forrest France
|
|
|
Corrections are complete, fire sprinkler permit finaled.
|
INSP-Final Inspection | 8/27/2007 | 8/27/2007 | 8/27/2007 | P | FAIL |
Forrest France
|
|
|
Corrections are not complete, one head location is overspaced from an adjacent wall.
|
INSP-Final Inspection | 8/24/2007 | 8/24/2007 | 8/24/2007 | P | FAIL |
Forrest France
|
|
|
Overspaced heads at four locations.
|
INSP-Final Inspection | 8/23/2007 | 8/23/2007 | 8/23/2007 | P | FAIL |
Forrest France
|
|
|
Work is not complete.
|
INSP-Final Inspection | 8/22/2007 | 8/22/2007 | 8/23/2007 | P | DEFR |
Forrest France
|
|
|
Rescheduled for 8/23.
|
INSP-Final Inspection | 8/17/2007 | 8/20/2007 | 8/20/2007 | A | PART |
Forrest France
|
|
|
Functional testing of the preaction system only, remainder of OH work is not ready for final inspection.
|
INSP-Final Inspection | 8/15/2007 | 8/16/2007 | 8/16/2007 | A | FAIL |
Forrest France
|
|
|
Scope of work is not yet complete, the preaction riser failed to function properly.
|
INSP-Final Inspection | 8/14/2007 | 8/15/2007 | 8/15/2007 | A | NR |
Forrest France
|
|
|
Project is not ready for final inspection at this time.
|
INSP-Sprinkler Rough-in/Hydro | 8/13/2007 | 8/14/2007 | 8/14/2007 | P | PART |
Forrest France
|
|
|
24 hr pneumatic test for the preaction system passed.
|
INSP-Final Inspection | 8/10/2007 | 8/13/2007 | 8/13/2007 | P | PART |
Forrest France
|
|
|
Begin air test at 3:30@ 49psig.
|
INSP-Sprinkler Rough-in/Hydro | 8/9/2007 | 8/10/2007 | 8/10/2007 | P | FAIL |
Forrest France
|
|
|
Pneumatic testing failed due to 3 1/2 psi pressure loss at the guage.
|
INSP-Sprinkler Rough-in | 8/9/2007 | 8/9/2007 | 8/9/2007 | P | PART |
Forrest France
|
|
|
Begin 24 hr air testing at 45 psi.@4:00 pm.
|
Inspection Record Card- Fire | 6/12/2007 | | 6/12/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/12/2007 | | DONE |
|
|
|
|
Telephone call | | | 6/12/2007 | | DONE |
|
|
|
t/c w brodie at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 6/12/2007 | | |
|
|
|
|
Issue and Print Permit | | | 6/12/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 5/22/2007 | | 6/7/2007 | | PASS |
|
|
|
plans are approved as submitted by bryan johnson
|
Case Summary | | | 5/22/2007 | | |
|
|
|
|
Application received | | | 5/22/2007 | | |
|
|
|
|
Pending Assignment by SAM | 5/22/2007 | | | | |
|
|
|
|